My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
639
>
3500 - Local Oversight Program
>
PR0544513
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:42:10 PM
Creation date
5/31/2019 4:38:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544513
PE
3528
FACILITY_ID
FA0024115
FACILITY_NAME
WEST CLAY PROPERTY
STREET_NUMBER
639
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14707110
CURRENT_STATUS
02
SITE_LOCATION
639 W CLAY ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Work Plan <br /> WEST CLAY PROPERTIES <br /> 639 West Clay Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES.. . . . . . . . . . . . . . . . . . . 2 <br /> 2.2. DRILLING AND SOIL SAMPLE COLLECTION.. . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. MONITORING WELL INSTALLATION, DEVELOPMENT& SURVEY. . . . . 3 <br /> 2.4. GROUND WATER SAMPLING AND ANALYSIS. . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 2.5. PREPARATION OF REPORT OF FINDINGS. . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.0. FIELD PROCEDURES.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.1. PILOT SOIL BORING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2. WELL COMPLETION AND WELL ELEVATION SURVEY. . . . . . . . . . . . . . . 5 <br /> 3.3. WELL DEVELOPMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.4. GROUNDWATER SAMPLING PROCEDURES. . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.4.1. Static Water Level Measurements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.4.2. Well Evacuation.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.4.3. Sample Withdrawal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.4.4. Sample Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT. . . . . . . . . . . 7 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Vicinity Plan <br /> Figure 3 - Ground Water Contaminate Plume: HU2 <br /> Figure 4 -Monitoring Well Design -MW-27 <br /> Figure 5 -Monitoring Well Design -MW-28 <br /> APPENDICES <br /> Appendix A - Site Background Information <br /> Appendix B -EHD letter dated 02 April 2009/15 September 2009 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.