Laserfiche WebLink
03,23/95 15:24 E 299 948 1645 PSS COMPANY P.02 <br /> . .. <br /> �► r Kleinfelder, Inc. (Stockton) 209) 948-0621 -Created Thursday,March.t�, l y— � --aura - --------------- <br /> ----- y�-- ---------------- --- <br /> - Fax Cover Sheet - <br /> Date: 03/23195 Time'. 11 :10 am <br /> Pages: 1 <br /> To: Ms, Michelle Mariani <br /> West Clay properties <br /> Fax Phone: 209-948-6652 <br /> From: Robert "Tony`, Martin, R.E.A. <br /> Kleinfelder, Inc. <br /> Stockton Office <br /> 2625 East Myrtle Street <br /> Stockton} California 95205 <br /> Phone: 209-948-134 5 <br /> Fax: 209-948-4621 <br /> Subject: Michelie. ........in accordance with your rogues:1 am providing you with this <br /> summary of 1144y groundwater moritodng tasks which will likely he associated with the March 31, 1995 <br /> sampling at your site. These tasks have been oviiined in greater detall in the December 1994 1144y <br /> monitoring report The tasks are a5 t0110W. 1)All 3 monitoring wells will be unlocked anti uncapped and <br /> eliow+ad to equilibrate with the amtosphere for a period of approximately 30 minutes,2)All wells would be <br /> electronically sounded for water level dW..h, 3)All water level depths wo rid be convened to elevation data, <br /> 4),1 he 3 wells would be char:ked for the pr?ss9WA leSeMe ol determinationom would bet and <br /> nde by tor he County representative <br /> y I0W@1rifbq IN <br /> transparent disposable bailer into each well. 5) r e b ball) from talionl1 <br /> which wails)will be required to be sampled,s)Three to 5 well volumes ewouldi beith Wield- y braced meter,t3} <br /> monitoring Wail,7)ECremperatureVH would be monitored during p rg ng <br /> One sample Will becoldeCted by Lmp of a bailer from oly t well,8)Reld paperwork will include meter <br /> readings. Volumes purged, sounding data, water elevation data,etc..—8)One grounowater sample and Oo <br /> QAM samples will be submitted to an analytical laboratory for analysts to determine the presence and <br /> Concentration of BTEXITPH-Gas,and td)Following a 2-3 week analytical turnaround,a st,nn"data- <br /> SUbmItIal"Style report would be complied and submitted to West Clay properties for submittal by them with a <br /> seperate cover letter to the appropriate agenCles A}I work Would be subject to the&$sumptlons,terms, <br /> conditions and limltatiom ar our original approved proposal to West Clay Prop©nles. The above-described <br /> work would be performed on a Nme and materials basis"for a tee not to eKcaod approximately$5004800• <br /> If there are any questions please Leet tree to contact me <br /> Thank YW <br />