Laserfiche WebLink
State eater Resources Control''Board <br /> Division of Clean Water Programs ,;. <br /> Winston H. Hickox 2014 T Street•Sacramento,California 95814•(916)227-4518 <br /> Mailing Address: P.O.Box 944212•Sacramento,California•94244-2120 Gray Davis <br /> Secretoryfor FAX(916) �'227-4530•Internet Address: ht kw- '• g o e H;Rcb -cca: ov/ /ustcf Governor <br /> Environmental 4 <br /> Protection <br /> r <br /> January 28, 2000 <br /> Paul J. Van Dyken, Sr. <br /> N & S Irrigation <br /> P O Box 805 <br /> Ripon, CA 95366 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO.012246, <br /> SITE ADDRESS: 215 MAIN ST W,RIPON, CA 95366 <br /> I have reviewed your request,received on January 13,2000, for pre-approval of corrective action costs; I <br /> will place these documents in your file for future reference. I have included a copy of the"Cost Pre- <br /> Approval Request" form; please use this form in the future for requesting pre-approval of corrective <br /> action costs. <br /> With the following provisions, the total cost pre-approved as eligible for reimbursement for disposal of 7 <br /> drums of soil and 275 gallons of drummed groundwater is$ 1,436; see the table below for a breakdown <br /> of costs. (The total amount approved for payment through request number 1.0 for work at your site that <br /> has been directed and approved by the County is$ 11,953.) <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms ofyour Letter of Commitment at costs consistent with those pre-approved in <br /> this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task I Amount Pre-Approved Comments - <br /> 1. Soil transport&disposal $736 <br /> 2. Groundwater disposal $580 <br /> 3. Letter report preparation $120 <br /> TOTAL PRE-APPROVED $ 1,436 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> California En vironmental Protection Agency <br /> �a Recycled Paper <br />