My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001630
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
639
>
3500 - Local Oversight Program
>
PR0544513
>
ARCHIVED REPORTS XR0001630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 12:17:38 PM
Creation date
6/14/2019 10:48:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001630
RECORD_ID
PR0544513
PE
3528
FACILITY_ID
FA0024115
FACILITY_NAME
WEST CLAY PROPERTY
STREET_NUMBER
639
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14707110
CURRENT_STATUS
02
SITE_LOCATION
639 W CLAY ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G 4 <br /> I � <br /> 14 May 2003 <br /> AGE-NC Project No 01-0865 <br /> Page 2 of 5 <br /> disconnected,the power supply cord for the extraction pump Approximately 2,650 gallons of water <br /> were extracted from EW-2 during the eight-hour test <br /> - r <br /> 2 1 1 Pump Test Results <br />' During the variable rate pumping test (4 to 6 gpm), the maximum ground water drawn-down in <br /> extraction well EW-2 was observed to be 7 98 feet after 465 minutes of pumping operation utilizing <br />' water meter data Maximum draw-down was observed in the observation wells as follows <br /> • EW-2 (extraction well) at 7 98 feet after 465 minutes of pumping operation, <br />' • MW-2(located 15 feet toward the west-southwest)at 196 feet after 465 minutes of pumping <br /> operation <br /> I • MW-7(located 18 feet toward the west-southwest)at 0 43 feet after 465 minutes ofpumping ' <br /> operation <br /> • MW-1 (located 66 feet toward the east-southeast)at 0 23 feet after 450 minutes of pumping <br />'. operation, <br /> • AS-1 (located 15 feet toward the south-southwest)at 0 21 feet after 465 minutes of pumping <br />' operation, <br /> • MW-3 (located 67 feet toward the southwest) at 0 11 feet after 450 minutes of pumping <br /> operation, and I _ <br /> • MW-5 (located 84 feet toward the east-northeast) at 0 05 feet after 465 minutes of pumping <br /> operation , <br /> The maximum ground water draw-downs in observation wells MW-1,MW-2 and MW-3 versus the <br />' distance ofthese wells from the extraction point were graphed on semi-logarithmic paper(Appendix <br /> B), these wells were screened at approximately the same depth as well EW-2'and 'were used to <br /> - calculate hydrologic properties Wells-,MW-5,,MW-7 and-AS-1 were screened-at different depths, <br />' and their hydrologic properties may be different <br /> A graph of draw-down versus,time for extraction well EW-2 and observation wells MW-1,MW-2 <br />' and MW-3 are included in Appendix C ' <br /> E <br /> 1 I ! <br /> I I <br /> i <br /> Advanced GeaEnvironmental,Inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.