My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLIFTON COURT
>
16500
>
3500 - Local Oversight Program
>
PR0544564
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 12:04:47 PM
Creation date
6/14/2019 11:26:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544564
PE
3528
FACILITY_ID
FA0005646
FACILITY_NAME
SARALE FARMS INC
STREET_NUMBER
16500
Direction
W
STREET_NAME
CLIFTON COURT
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18904011
CURRENT_STATUS
02
SITE_LOCATION
16500 W CLIFTON COURT RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 August 2012 <br /> AGE-NC Project No. 01-0887 <br /> Page 2 of 6 <br /> Monitoring well MW-1: <br /> • Water quality objectives for dissolved TPH-g should be achieved by 2035; <br /> • Water quality objectives for dissolved MTBE could not be projected due to upward <br /> trending concentrations; and <br /> • Water quality objectives for dissolved benzene could not be projected due to <br /> upward trending concentrations. <br /> Monitoring well MW-2: <br /> • Water quality objectives for dissolved TPH-g should be achieved during 2012. <br /> • Water quality objectives for dissolved benzene should be achieved during 2020. <br /> Monitorin_g well MW-3: <br /> • Water quality objectives for dissolved TPH-g should be achieved shortly after 2013. <br /> • Water quality objectives for dissolved MTBE could not be projected due to,upward <br /> trending concentrations; and <br /> • Benzene concentrations have achieved water quality objectives and should maintain <br /> non-detectable levels. <br /> SOIL VAPOR INTRUSION WORK PLAN <br /> AGE proposes to collect soil-vapor samples to assess the potential for soil-vapor intrusion <br /> into the existing buildings on-site. <br /> The scope of work for this investigation will consist of the following tasks: <br /> • Permitting and pre-field work preparations; <br /> • Geoprobe advancement and soil vapor sample collection; <br /> • Soil vapor sample analysis; <br /> • Review and analysis of soil vapor data; and <br /> • Report preparation. <br /> Advanced GcoEnvironmcntal,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.