My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
820
>
2900 - Site Mitigation Program
>
PR0505261
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 2:31:42 PM
Creation date
6/14/2019 2:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505261
PE
2953
FACILITY_ID
FA0006669
FACILITY_NAME
LODI USD-TRANSPORTATION FAC
STREET_NUMBER
820
Direction
S
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04925028
CURRENT_STATUS
02
SITE_LOCATION
820 S CLUFF AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WHF Environmental Consultants, Inc. <br /> Health & Suety Plan <br /> Page. 2 <br /> L - <br /> r 2. Assuring that personnel are aware of the provisions of this plan, are <br /> t•. instructed in the work practices necessary to ensure safety, and in <br /> planned procedures for dealing with emergencies. <br /> 3. Assuring that personnel are aware f the potential hazards associated <br /> j-- with site operations. <br /> 4. Monitoring the safety performance of all personnel to ensure that the <br /> - required work practices are employed <br /> 5. Correcting any work practices or conditions that may result in injury or <br /> f exposure to hazardous substances. <br /> i <br /> a. <br /> 6. Preparing any accident/incident repcirts (see attached Accident Report <br /> t Form). <br /> 1.4 Pe ect Employee <br /> Project Employees involved in on-site investigations are responsible for: <br /> L 1. Taking all reasonable precautions to prevent injury to themselves and to <br /> fi <br /> their fellow employees. <br /> I <br /> 2 Implementing Health and Safety Pro (gram and reporting to the PSO for <br /> = any action deviating from the anticipated conditions described in the <br /> Health and Safety Plan. <br /> 1.5 - Special Instructions <br /> It is the. responsibility of the ProjectManager and the Health and Safety <br /> Manager to review the available site informa�tion to determine, to what degree <br /> the Health and Safety Plan will be implemented. Each site will be handled on a <br /> f case-by-case basis. <br /> I <br /> C _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.