My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
820
>
2900 - Site Mitigation Program
>
PR0505261
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 2:31:42 PM
Creation date
6/14/2019 2:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505261
PE
2953
FACILITY_ID
FA0006669
FACILITY_NAME
LODI USD-TRANSPORTATION FAC
STREET_NUMBER
820
Direction
S
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04925028
CURRENT_STATUS
02
SITE_LOCATION
820 S CLUFF AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ low <br /> WHF Environmental Consultants, Inc. <br /> Health & Sc{f'ety Plan <br /> Page. 3 <br /> J <br /> 2.0 SAFETY IMPLEMENTATION <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The following list defines the required personnel protective equipment. <br /> .J <br /> 23 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager: <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br />
The URL can be used to link to this page
Your browser does not support the video tag.