My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2800 - Aboveground Petroleum Storage Program
>
PR0516327
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:37:41 AM
Creation date
6/17/2019 3:51:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516327
PE
2832
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix G <br /> SPCC Plan Review and Amendment Log Plant #22 — 40 CFR 112.5(b) <br /> Complete this form every 5 years or when a change at the Facility requires a new PE Certification. <br /> "I have completed "I have completed review <br /> P.E. Re- review and evaluation of and evaluation of the <br /> Reason for Review/ Amendment Section or Cert. the SPCC Plan for Plant SPCC Plan for Plant#22, <br /> Amendment Required Page Require #22, and will amend the and will not amend the <br /> � . <br /> (Yes/No) Affected (Yes/No, Plan as a result" Plan as a result." <br /> Name and Title of Person Signing the Above <br /> • <br /> 03/2011 SPCC Plan Revised by PE Yes All Yes GHD <br /> 06/2014 Updated Employee Information Yes All No <br /> 08/2016 Updated per County NOV Yes All Yes GHD <br /> 11/2017 New Template, update SPCC Yes All Yes GHD <br /> with information re: new double- <br /> walled waste oil tanks that <br /> replaced old single-walled waste <br /> oil tanks in A/B and C <br /> basements. Based on interview <br /> of Bill Boscacci at the facility, old <br /> single walled waste oil tanks <br /> were properly cleaned, and tank <br /> and rinse water were <br /> appropriately disposed off as <br /> scrap metal and oily water, <br /> respectively. <br /> GHD I Spill Prevention, Control,and Countermeasure(SPCC)Plan 11189093(1)l Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.