Laserfiche WebLink
Complete this form every 5 years or when a change at the Facility requires a new PE Certification. <br /> "I have • completed review <br /> P.E. Re- review and evaluation of and evaluation of the <br /> Reason for Review/ Amendment Section or Cert. the SPCC Plan for Plant SPCC Plan for Plant#22, <br /> Amendment� . . will amend the and <br /> Requirej <br /> will not amend the(Yes/No) Affected (Yes/No) Plan as a result." Plan as a result." <br /> Name and Title of Person Signing the Above <br /> Certification <br /> 11/2018 Update plant manager name, Yes Management Yes GHD <br /> facility personnel contact phone Approval, <br /> numbers, update site plan, add Sections 1, <br /> portable oily water storage tote, 6.1.1, 6.2, <br /> containment calculations, and 6.4 <br /> amend inspection checklist. <br /> Tables 1, 2 <br /> Figure 3 <br /> 2/2019 Replaced the oily water storage Yes Sections Yes GHD <br /> tote by an SPCC compliant 6.1.1, 6.2, <br /> double walled oily water tank. 6.4, 8.1. <br /> Updated figures 3 and 3-4, tables <br /> 1 and 2. Amended the monthly Appendix A: <br /> inspection checklist. Figure 3 and <br /> Figure 3-4 <br /> Appendix B: <br /> Table 1 and <br /> Table 2. <br /> Appendix D. <br /> GHD I Spill Prevention, Control,and Countermeasure(SPCC)Plan 11189093(1)l Page 2 <br />