Laserfiche WebLink
Complete this form every 5 years or when a change at the Facility requires a new PE Certification. <br /> "I have • completed review <br /> P.E. Re- review and evaluation of and evaluation of the <br /> Reason for Review/ Amendment Section or Cert. the SPCC Plan for Plant SPCC Plan for Plant#22, <br /> Amendment� . . will amend the and <br /> Requirej <br /> will not amend the(Yes/No) Affected (Yes/No) Plan as a result." Plan as a result." <br /> Name and Title of Person Signing the Above <br /> Certification <br /> 6/2019 Updated Tables 1 and 2 to Yes Yes GHD <br /> amend generator tank <br /> identification, add new drums <br /> and totes, remove tanks without <br /> oil, correct and update tank <br /> information, and include <br /> secondary containment <br /> calculations for generators. <br /> Updated text to include and <br /> expand inspection information <br /> and environmental equivalence <br /> discussion. Replaced inspection <br /> checklist with comprehensive <br /> monthly and annual inspection <br /> checklists for both portable and <br /> stationary tanks. Updated Figure <br /> 3 to document locations of oil <br /> containers. Added SJCEHD <br /> Phone#to Contingency Plan. <br /> GHD I Spill Prevention, Control,and Countermeasure(SPCC)Plan 11189093(1)l Page 3 <br />