My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2800 - Aboveground Petroleum Storage Program
>
PR0516327
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:37:41 AM
Creation date
6/17/2019 3:51:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516327
PE
2832
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bond <br /> Table of Contents (cont'd) <br /> 10. Inspections, Tests, and Records-§112.7(e) ..............................................................................4 <br /> 10.1 Visual Non-Documented Observations..............................................................................4 <br /> 10.2 Monthly and Annual Documented Inspections ..................................................................4 <br /> 10.3 Monthly Response Equipment Inspections........................................................................ 5 <br /> 10.4 Completed Inspection Forms............................................................................................. 5 <br /> 11. Training & Discharge Prevention -§112.7(f)............................................................................... 5 <br /> 11.1 Personnel Training-§ 112.7(f)(1)..................................................................................... 5 <br /> 11.2 Emergency Coordinator-§112.7(f)(2).............................................................................. 5 <br /> 11.3 Spill Prevention Briefings-§112.7(f)(3)............................................................................ 5 <br /> 12. Security-§ 112.7(g).................................................................................................................... 6 <br /> 12.1 Access Control................................................................................................................... 6 <br /> 12.2 Flow Drains and Valves..................................................................................................... 6 <br /> 12.3 Pump Starter Control......................................................................................................... 6 <br /> 12.4 Connections to Pipelines ................................................................................................... 6 <br /> 12.5 Facility Lighting .................................................................................................................. 6 <br /> 13. Tank Car&Truck Loading/Unloading Rack-§112.7(h).............................................................6 <br /> 13.1 Unloading Area Drainage-§112.7(h)(1)........................................................................... 7 <br /> 13.2 Disconnect Warning-§112.7(h)(2)................................................................................... 7 <br /> 13.3 Examination of Tank Truck Drains-§112.7(h)(3)............................................................. 7 <br /> 14. Tank Alterations-§112.7(i)......................................................................................................... 7 <br /> 15. State or Local Spill Prevention Rules-§112.70) ........................................................................7 <br /> 16. Qualified Oil-Filled Operational Equipment-§112.7(k)............................................................... 8 <br /> 17. SPCC Requirements for Onshore Facilities-§112.8.................................................................. 8 <br /> 17.1 Facility Drainage-§112.8(b)............................................................................................. 8 <br /> 17.1.1 Valves & Pumps in Diked Areas-§112(8)(b)(1-2)........................................... 8 <br /> 17.1.2 Facility Drainage from Undiked Areas-§112.8(b)(3)...................................... 9 <br /> 17.1.3 Drainage Diversion System -§112.8(b)(4)...................................................... 9 <br /> 17.1.4 Facility Drainage Systems-§112.8(b)(5)........................................................ 9 <br /> 17.2 Bulk Storage Tanks-§112.8(c)........................................................................................ 9 <br /> 17.2.1 Tank Compatibility-§112.8(c)(1) .................................................................... 9 <br /> 17.2.2 Secondary Containment-§112.8(c)(2)........................................................... 9 <br /> 17.2.3 Draining Secondary Containment Areas-§112.8(c)(3)................................ 10 <br /> 17.2.4 Buried Metallic Storage Tanks-§112.8(c)(4)................................................ 10 <br /> 17.2.5 Partially Buried Metallic Storage Tanks-§112.8(c)(5).................................. 10 <br /> 17.2.6 Periodic Integrity Testing-§112.8(c)(6)........................................................ 10 <br /> 17.2.7 Internal Heating Coils-§112.8(c)(7).............................................................. 11 <br /> GHD I Spill Prevention, Control,and Countermeasure(SPCC)Plan 111189093(1)1 Page ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.