Laserfiche WebLink
bond <br /> Table of Contents (cont'd) <br /> 17.2.8 Fail-Safe Engineering—§112.8(c)(8)............................................................. 11 <br /> 17.2.9 Pump Cutoff- 112.8 (c)(8)(i)........................................................................... 12 <br /> 17.2.10 Effluents into Navigable Waters—§112.8(c)(9).............................................. 12 <br /> 17.2.11 Correction of Tank Deficiencies—§112.8(c)(10)............................................ 12 <br /> 17.2.12 Mobile/Portable Oil Storage Tank—§112.8(c)(11)......................................... 12 <br /> 17.3 Transfer Operations & In-Plant Process—§112.8(d) ...................................................... 12 <br /> 17.3.1 Buried Piping Installations—§112.8(d)(1)...................................................... 12 <br /> 17.3.2 Out of Service Piping—§112.8(d)(2).............................................................. 12 <br /> 17.3.3 Piping Support Design —§112.8(d)(3)............................................................ 12 <br /> 17.3.4 Inspection of Valves and Piping—§112.8(d)(4) ............................................. 13 <br /> 17.3.5 Aboveground Piping—§112.8(d)(5) ............................................................... 13 <br /> 17.4 Onshore Oil Production Facility Drainage—§112.9 ........................................................ 13 <br /> 17.5 Onshore Oil Drilling and Workover Facilities—§112.10.................................................. 13 <br /> 17.6 Offshore Oil Drilling, Production, Workover Facilities—§112.11..................................... 13 <br /> 17.7 Animal Fats and Oils— Subpart C, §112.12—§112.15................................................... 13 <br /> Appendix Index <br /> Appendix A Diagrams <br /> Figure 1 Site Location Map <br /> Figure 2 Site Aerial Map <br /> Figure 3 Facility Diagram <br /> Appendix B Tanks & Containment—40 CFR 112.7(a)(3) <br /> Table 1 Schedule of Regulated Tanks—40 CFR 112.7(a)(3)(i) <br /> Table 2 AST Secondary Containment Volume Calculations <br /> Appendix C Oil Spill Contingency Plan <br /> Table 3 Oil Spill Response Immediate Actions—40 CFR 112.7(a)(3)(iv) <br /> Table 4 Spill Response Notification Procedures—40 CFR 112.7(a)(4) <br /> Table 5 Emergency Contacts—40 CFR 112.7(a)(3)(vi) <br /> Table 6 Disposal Plan and Emergency Response Equipment—40 CFR <br /> 112.7(a)(3)(v) <br /> Appendix D Inspection Checklists <br /> Appendix E Applicability of Substantial Harm Criteria Checklist <br /> Appendix F Containment Drainage Log <br /> Appendix G SPCC Plan Review and Amendment Log—40 CFR 112.5(b) <br /> GHD I Spill Prevention,Control,and Countermeasure(SPCC)Plan 111189093(1)l Page iii <br />