Laserfiche WebLink
Plant#22 Spill Prevention,Control,and Countermeasure Plan <br /> Table 1 <br /> Tank and Secondary Containment Summary Table <br /> Plant#22 <br /> Excess/Deficiency After a <br /> Container Quantity,Size,Material Stored and(Location) Container Dimensions Container Type/Design Type of Worst Case Type of Secondary Largest Shell Container Gross Secondary Precipitation Freeboard 100%Release of the Tank <br /> u <br /> Failure;Alternative Types Capacity within Available after 110%Release Volume plus freeboard from Predicted Direction&Flow Rate if Uncontained or Containment Fails <br /> identified on Figure 3 (ft) Standard/Fabrication of Failures Containment Containment Containment Volume of the Largest Container a 25-year,24-hour rainfall <br /> event <br /> Diameter Length/ gals bbls gals gals gals <br /> Height 9 <br /> --50 Totes&-50 Drums of Machine Lubricant,Mold <br /> Swabbing Lubricant,Petroleum Based Ring Dope,Synthetic Instantaneous'; Inside Building Inside Building Inside Building Inside Building Totes/Drums are located inside a building.Released liquids would flow west <br /> Coating,Shear Spray Lubricant,Tractor Hydraulic Fluid, NA NA Plastic/Steel Rupture/Leak/Overfill (Blue Barn) 275 6.5 (Blue Barn) (Blue Barn) (Blue Barn) inside the building;flow rate will be relative to size of release. <br /> Motor Oil,New Grease,Used Oils,&Other Various Oils& <br /> Non-Oils(D-2) <br /> -5-55 gal Drums of Oily Water and Various Oils(D-3) NA NA Steel Instantaneous'; Inside Room 55 1.3 Inside Room Inside Room Inside Room Drums are located inside room.Released liquids would be contained within the <br /> Rupture/Leak/Overfill room;flow rate will be relative to size of release. <br /> Inside overpack drum, <br /> Instantaneous'; Drums are located inside building.Released liquids would flow into overpack <br /> 2-55 gal Drums of Vacuum Oil(D-5) NA NA Steel Rupture/Leak/Overfill Inside Furnace 55 1.3 55 NA NA drum;flow rate will be relative to size of release. <br /> Building <br /> -5-275 gal Totes of Gasflow Supreme Synthetic,450 IS Released liquids would flow into the secondary containment cabinets which is <br /> Machine Lubricant,Petroleum based Ring Dope,and NA NA Plastic Tote Instantaneous'; Oil Cabinets 360 8.6 845 241 NA sufficient for 110%of the largest container capacity;flow rate will be relative to <br /> Kleenbold 170 Glas Lubricant(D-6) Rupture/Leak/Overfill size of release. <br /> -3-275 gal Totes and-3 55-gal Drums of Various Oils(D- Instantaneous'; Released liquids would flow into the secondary containment cabinets which is <br /> 7) NA NA Plastic Tote Rupture/Leak/Overfill Oil Cabinets 360 8.6 845 241 NA sufficient for 110%of the largest container capacity;flow rate will be relative to <br /> size of release. <br /> -5-55 gal Drums of Compressor Oil and Oily Water NA NA Steel Instantaneous'; Inside Compressor 55 1.3 Inside Compressor Inside Compressor Room Inside Compressor Room Drums are loated inside a building.Released liquids would flow to the cullet <br /> (D-8) Rupture/Leak/Overfill Room Room sumps;flow rate will be relative to size of release. <br /> 2-55 gal Biosol Drums NA NA Steel Instantaneous'; Inside Furnace 55 1.3 Inside Furnace Building Inside Furnace Building Inside Furnace Building Drum is located inside building.Released liquids would flow inside building;flow <br /> (D-9) Rupture/Leak/Overfill Building rate will be relative to size of release. <br /> Inside Machine Repair Inside Machine Repair <br /> Instantaneous'; Inside Machine Repair Area on Inside Machine Repair Area on Drum is located inside building.Released liquids would flow into secondary <br /> -1-55 gal Drum of Oily Water(D-10) NA NA Steel Rupture/Leak/Overfill Area on Containment 55 1.3 Area on Containment Containment Pallet Containment Pallet containment pallet;flow rate will be relative to size of release. <br /> Pallet Pallet <br /> 1-C Cullet Sump Width:14 Length:24 Concrete Instantaneous'; Concrete NA NA NA NA NA <br /> (S-1) Rupture/Leak/Overfill Sump is located on the ground level(basement)of the building.Released <br /> liquids would flow to a sump located northeast of the furnace building.Released <br /> liquids from the second sump would flow to the stormwater ponds;flow rate will <br /> (S-2) Rupture/Leak/Overfill <br /> 1-A/B Cullet Sump Width:40 Length:12.5 Concrete Instantaneous'; Concrete NA NA NA NA NA be relative to size of release. <br /> GHD Services,Inc. <br /> GHD 77789093(1)APPB <br />