Laserfiche WebLink
Plant#22 Spill Prevention,Control,and Countermeasure Plan <br /> Table 1 <br /> Tank and Secondary Containment Summary Table <br /> Plant#22 <br /> Excess/Deficiency After a <br /> Container Quantity,Size,Material Stored and(Location) Container Dimensions Container Type/Design Type of Worst Case Type of Secondary Largest Shell Container Gross Secondary Precipitation Freeboard 100%Release of the Tank <br /> u <br /> Failure;Alternative Types Capacity within Available after 110%Release Volume plus freeboard from Predicted Direction&Flow Rate if Uncontained or Containment Fails <br /> identified on Figure 3 (ft) Standard/Fabrication of Failures Containment Containment Containment Volume of the Largest Container a 25-year,24-hour rainfall <br /> event <br /> Diameter Length/ gals bbls gals gals gals <br /> Height <br /> 1-100 gal Furnace Emergency Generator NA NA Sealed angle irons on 100 2.4 113 NA Inside Furnace Building <br /> (Gen-A) concrete <br /> The diesel-powered emergency generators are located on the ground level of <br /> 1-660 gal Furnace Emergency Generator NA NA Steel/Shop Fabricated Instantaneous'; Skid Containment 660 15.7 660 NA Inside Furnace Building the furnace building. Secondary containment is sufficient for 100%of the <br /> (Gen-B) Rupture/Leak/Overfill largest container release.Released liquids would remain within containment <br /> area;flow rate will be relative to size of release. <br /> 1-200 gal Furnace Emergency Generator NA NA Sealed angle irons on 200 4.8 262 NA Inside Furnace Building <br /> (Gen-C) concrete <br /> Oil-Filled Operational Equipment <br /> Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Oil-Filled Alternative Requirements per 40 CFR 112.7(k)(2)-skid or pad, <br /> 1-105 gal Hydraulic Oil Reservoir for Cardboard Bailer Instantaneous'; implementation of the Oil Spill Contingency Plan(Appendix C),inspections,and <br /> NA NA Steel/Shop Fabricated Alternatives per 40 105 2.5 Alternatives per 40 Alternatives per 40 CFR 112.7 Alternatives per 40 CFR 112.7 <br /> (R-1) Rupture/Leak/Overfill written commitment to manpower.Released liquids would flow inside the <br /> CFR 112.7(k)(2) CFR 112.7(k)(2) (k)(2) (k)(2) building;flow rate will be relative to size of release. <br /> Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Oil-Filled Alternative Requirements per 40 CFR 112.7(k)(2)-skid or pad, <br /> 3-95 gal Compressors Instantaneous'; implementation of the Oil Spill Contingency Plan(Appendix C),inspections,and <br /> NA NA Steel/Shop Fabricated Alternatives per 40 95 2.3 Alternatives per 40 Alternatives per 40 CFR 112.7 Alternatives per 40 CFR 112.7 <br /> (Comp-1) Rupture/Leak/Overfill CFR 112.7(k)(2) CFR 112.7(k)(2) (k)(2) (k)(2) written commitment to manpower.Released liquids would flow towards the <br /> cullet sumps;flow rate will be relative to size of release. <br /> Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Oil-Filled Alternative Requirements per 40 CFR 112.7(k)(2)-skid or pad, <br /> 2-150 gal Compressors Instantaneous'; implementation of the Oil Spill Contingency Plan(Appendix C),inspections,and <br /> NA NA Steel/Shop Fabricated Alternatives per 40 150 3.6 Alternatives per 40 Alternatives per 40 CFR 112.7 Alternatives per 40 CFR 112.7 <br /> (Comp-1) Rupture/Leak/Overfill CFR 112.7(k)(2) CFR 112.7(k)(2) (k)(2) (k)(2) written commitment of manpower.Released liquids would flow towards the <br /> cullet sumps;flow rate will be relative to size of release. <br /> Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Oil-Filled Alternative Requirements per 40 CFR 112.7(k)(2)-skid or pad, <br /> 1-70 gal Compressor Instantaneous'; implementation of the Oil Spill Contingency Plan(Appendix C),inspections,and <br /> NA NA Steel/Shop Fabricated Alternatives per 40 70 1.7 Alternatives per 40 Alternatives per 40 CFR 112.7 Alternatives per 40 CFR 112.7 <br /> (Comp-1) Rupture/Leak/Overfill CFR 112.7(k)(2) CFR 112.7(k)(2) (k)(2) (k)(2) written commitment of manpower.Released liquids would flow towards the <br /> cullet sumps;flow rate will be relative to size of release. <br /> Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Operational Oil-Filled Oil-Filled Alternative Requirements per 40 CFR 112.7(k)(2)-skid or pad, <br /> 11-(Transformers[4 owned by PG&E,7 owned by Owens- Instantaneous'; implementation of the Oil Spill Contingency Plan(Appendix C),inspections,and <br /> NA NA Steel/Shop Fabricated Alternatives per 40 55-3870 >1 Alternatives per 40 Alternatives per 40 CFR 112.7 Alternatives per 40 CFR 112.7 <br /> Illinois]) Rupture/Leak/Overfill written commitment of manpower.Released liquids would flow towards low point <br /> CFR 112.7(k)(2) CFR 112.7(k)(2) (k)(2) (k)(2) on ground;flow rate will be relative to size of release. <br /> Notes: <br /> 1 -Instantaneous failure equates to the total volume of the containment released in less than 1 minute. <br /> GHD Services,Inc. <br /> GHD 77789093(1)APPS <br />