Laserfiche WebLink
Mr. Mike Pitta 16 - 2 - 0 8 September 2003 <br /> KMEP must submit a proposed RAP for the entire site that includes phytoremediation for the <br /> source area and the bioremediation pilot study for the toe of the plume. Mark Wuttig of CH2M <br /> Hill informed me that the phytoremediation work plan was being prepared and that it will be <br /> submitted for our review sometime by the end of September. The two documents should be <br /> submitted as one RAP for the site. An alternative strategy would be for KMEP to provide the <br /> next document as a RAP and refer to the Pilot Study Work Plan for details with regard to <br /> remediation at the toe of the plume. Upon staff review the Executive Officer of the Regional <br /> Board will provide concurrence on the RAP. <br /> If you have any questions, you may contact me at (916) 255-3082. <br /> ARJERRA <br /> Private Sites Cleanup Unit <br /> cc: Mr. Carol Oz, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Mark Wuttig, C112M Hill, Thousand Oaks <br />