Laserfiche WebLink
i KLE/NFELOER <br /> �� 6.yt haple.N9ISa.:ri <br /> 2 SOIL AND GROUNDWATER ASSESSMENT <br /> Kleinfelder understands the soil and groundwater assessment must comply with the <br /> RWQCB guidelines and address a description of the geology and hydrogeology of the <br /> area, groundwater quality at the site, and assess the potential for the proposed <br /> discharge to degrade groundwater quality. <br /> The proposed scope of services is as follows: <br /> 2.1 PRE-FIELD AND PERMITTING ACTIVITIES <br /> Prior to field mobilization, Kleinfelder will obtain boring permits from San Joaquin <br /> County Environmental Health Department (SJCEHD) and prepare a site-specific health <br /> and safety plan. Upon receipt of the boring permits (typically a two to three week <br /> turnaround from SJCEHD), Kleinfelder will schedule the field work with the drilling <br /> subcontractor and notify the City of Tracy. <br /> As part of the pre-field activities, Kleinfelder will conduct a site visit to evaluate site <br /> conditions and equipment access. The proposed groundwater sample locations will be <br /> marked in white paint and/or staked. Kleinfelder will require the boring contractor to <br /> contact Underground Service Alert 48 hours prior to conducting field work to notify local <br /> utilities of the proposed subsurface assessment. Kleinfelder requests that the City of <br /> Tracy provide available as-built information regarding the locations of onsite subsurface <br /> utilities for its use in this activity as applicable. <br /> Kleinfelder requests that the City of Tracy make arrangements to provide site access for <br /> work during regular business hours to complete the proposed monitoring wells. <br /> 2.2 UNDOCUMENTED SOIL STOCKPILE ASSESSMENT <br /> Soil Stockpiles <br /> Kleinfelder estimates that approximately 9,500 cubic yards of soil are present on the site <br /> (Plate 3). This estimate was calculated by first reviewing aerial photos of the waste <br /> piles present across the parcel, and counting approximately 1,056 piles. It was <br /> 128328/SAC14R0267 Page 3 of 11 July 12, 2013 <br /> Copyright 2013 Kleinfelder Revision 2-February 14,2014 <br />