Laserfiche WebLink
KLE/NFELOER <br /> On October 25, 2013 Kleinfelder submitted a revised workplan to comply with the <br /> closure/compliance requirements and items contained in the September 23, 2013 letter <br /> from the RWQCB. <br /> In a letter dated December 12, 2013, the RWQCB requested additional revisions to the <br /> workplan including additional soil and groundwater sample locations. This second <br /> revised workplan was prepared to outline the scope and methodologies for the <br /> collection of soil and groundwater samples and characterization of undocumented fill. <br /> Kleinfelder understands the RWQCB must first approve the workplan before field work <br /> can begin. <br /> 128328/SAC14R0267 Page 2 of 11 July 12, 2013 <br /> Copyright 2013 Kleinfelder Revision 2-February 14,2014 <br />