Laserfiche WebLink
Mr.Michael L kdWma,Jr. <br /> October 91 19917 <br /> Page 2 <br /> the POOPUty owner,Mr.Hagop Manuelian. This MTBE analyses pertains to offsite issues <br /> unrelated to CPL,'s historical pipeline. <br /> It is my understandift that you will grant site close for the parcel if the following conditions are <br /> met: 1)the groundwater analytical results for MTBE indicate ma-detectable concentrations; <br /> 2)She ammainder of the amdyiical results for groundwater are below amicable water quality <br /> objectives;and 3)the soil aaalytical results are shown to be below concentrations associated with <br /> dVWcant risk to humus bealth. It is also my w��ding that if only conditions 2)and 3)are <br /> met,dot while you win not grm site clown,you wi0 agree that no further action will be <br /> requind with respect to investigating possible impact from CPL's historical pipeline. <br /> The fold work will be scheduled within two weeks of your approval of this proposed wodgAan. <br /> You will be notified at least 48 hours in advance of start of any field work. Please call <br /> Elizabeth Lu (510/942-6955)if you have any questions or require additional information. <br /> Sincerely, <br /> mftt6g�� �>e <br /> K. L.. Hower <br /> Cal braia site Rewiediation <br /> TETUB78.DOC <br /> Attachments <br /> cc: Elizabeth Lu-CPIXmoiaatdx consultants,Inc. <br /> Hagop Manuaiian-Cintra Group,Inc. <br />