My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2900 - Site Mitigation Program
>
PR0517291
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:56:38 AM
Creation date
6/19/2019 9:50:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517291
PE
2959
FACILITY_ID
FA0013309
FACILITY_NAME
TRACY TEST FACILITY
STREET_NUMBER
32727
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25112004
CURRENT_STATUS
01
SITE_LOCATION
32727 CORRAL HOLLOW RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHOW ENGINEERING, INC. • • <br /> 7 May 2001 <br /> Site Specific Safety Plan <br /> Solid Waste Management Unit (SWMU) 21 and <br /> Area of Concern 4 <br /> 32727South Corral Hollow Road <br /> Tracy, California <br /> 7 May 2001 <br /> General Dynamics (GD), formerly Primex, Inc. has retained Chow Engineering, Inc. to <br /> provide soil (sediment) sampling, analytical services and sediment excavation and <br /> backfilling services at the GD facility at 32727 Corral Hollow Road southwest of Tracy, <br /> California (site). The following sections of the Site Specific Safety Plan (SP) address <br /> issues pertinent to the safe completion of the work at the site. <br /> 1.0 Discussion <br /> Statement of Company Policy <br /> CE is dedicated to the protection of its employees from on-the-job injuries. All <br /> employees and subcontractors have a responsibility to work safely on the job. The <br /> purpose of this plan is to ensure that CE and subcontractor employees on the GD's <br /> project at the site recognize all hazards and their associated precautionary measures. <br /> This document is supported by and references CE Standards of Practice (SOP) specific <br /> to the work being performed as described in the following Work Summary. <br /> CE SOP #001 General Provisions — Health & Safety Plans <br /> CE SOP #002 Safe Work Practices <br /> CE SOP #003 Tailgate Safety Meeting Forms <br /> This summary document is intended to be utilized in conjunction with the previously <br /> mentioned SOP's that provide specific guidance and procedures relative to each topic <br /> and consideration presented. <br /> All personnel engaged in the physical operations aspects of the work who may be at <br /> risk for exposure to hazardous and/or regulated wastes or materials, in addition to all <br /> visitors, observers and regulatory inspectors who require admission into controlled <br /> areas on the project site, will be trained and certified under the applicable regulations <br /> of 29 CFR 1910.120, CCR Title 8, State and/or local requirements. Evidence of current <br /> Site Specific Safety Plan <br /> General Dynamics(Primex, Inc.) <br /> SWMU 21 and AOC 4 Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.