My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2900 - Site Mitigation Program
>
PR0517291
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:56:38 AM
Creation date
6/19/2019 9:50:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517291
PE
2959
FACILITY_ID
FA0013309
FACILITY_NAME
TRACY TEST FACILITY
STREET_NUMBER
32727
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25112004
CURRENT_STATUS
01
SITE_LOCATION
32727 CORRAL HOLLOW RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHOW ENGINEERING,INC. • • <br /> 7 May 2001 <br /> compliance with training requirements for CE employee, subcontractor employees and <br /> visitors will be verified prior to admission into all controlled work areas. <br /> 2.0 Scope of Work <br /> The Scope of Work for this project includes; <br /> 1) Mark sediment sampling and excavation locations for USA clearance, <br /> 2) Sediment sample collection and analysis, <br /> 3) Excavation of petroleum hydrocarbon impacted soil, <br /> 4) Stockpiling of excavated sediments, <br /> 5) Disposal of excavated sediments <br /> 6) Excavation of soil for installation of new machine foundation, <br /> 7) Backfilling of excavations with imported sediment, and <br /> 8) Preparation of a project report. <br /> All work will be accomplished in a controlled, safe and professional manner. <br /> Additionally, work will be performed in accord with the project specifications, Scope of <br /> Work presented in the proposal for the work (copy attached) and accepted industry <br /> practices. <br /> 3.0 Responsibilities <br /> It is the responsibility of CE's Health and Safety Manager, Maurice Baron, to implement <br /> this SP. Regular observations of work operations and enforcement of the safety policy <br /> and procedures shall be performed by Rodger Berzinski, Site Health Safety Officer <br /> (SSO). It is the responsibility of the SSO, with concurrence with Mr. Baron, to correct <br /> unsafe practices or conditions immediately. <br /> It is the responsibility of CE to ensure that all employees understand and adhere to the <br /> procedures of this plan and to follow the instructions of the Crew Foreman/SHSO. <br /> It is the responsibility of the employee to make management aware of any unsafe or <br /> hazardous conditions or work practices that may cause injury to either themselves or <br /> any other employee. Either Mr. Baron or Mr. Clark will approve, in writing, changes to <br /> the SP. <br /> As the job progresses, the SP shall be reviewed by a qualified person, to determine if <br /> additional practices, procedures or training need to be implemented. Workers shall be <br /> notified and trained, if necessary, in the new procedures. A copy of this plan and all <br /> approved changes shall be maintained at the jobsite. <br /> Site Specific Safety Plan <br /> General Dynamics(Primex,Inc.) <br /> SWMU 21 and AOC 4 Project 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.