Laserfiche WebLink
`mold <br /> 1 BP OIL . .•.,1, '•t <br /> WEALTH l f� BP Oil Company <br /> • { 1 r }F ��++ Environmental Resources Management <br /> Building 13,Suite N <br /> JULf� 295 SW 41st Street <br /> '9} U —B PH 1: 26 Renton,Washington 98055-4931 <br /> (206)251-0667 <br /> Transmitted via facsimile - original to follow <br /> July 1, 1994 <br /> San Joaquin Environmental Health Department <br /> Attention Mr. Michael Infurna - Senior REHS <br /> 445 N. San Joaquin Street <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> RE: BP Oil Site No. 11192 <br /> Site Code: 1995123 <br /> 1403 Country Club Boulevard <br /> Stockton, CA <br /> Dear Mr. Infurna: <br /> I am writing in response to your letter dated April 14 , 1994 , and <br /> to follow-up our recent telephone discussion. Several concerns <br /> were listed in your letter, and I would like to respond to each <br /> concern as they were raised. <br /> First, I have attempted to keep the County informed of our <br /> conclusions and plans for further work in the cover letters <br /> accompanying the quarterly monitoring reports . As you know, MW-7 <br /> is the only well where fuel constituents have been detected in <br /> the groundwater since the March, 1992 sampling event . We plan to <br /> continue our monitoring efforts in order to obtain sufficient <br /> data to tender a request for site closure . <br /> You should note that Alisto Engineering Group is performing <br /> groundwater monitoring activities at all of the BP sites located <br /> in California. Turnaround for the reports is typically on the <br /> order of 60-days . Given the scope of activities necessary to <br /> complete sampling and reporting at all of our sites, we believe <br /> that this is an appropriate length of time to all of the various <br /> agencies in the State . If you disagree, please give me a call so <br /> that we can discuss this matter further. <br /> I understand that Alisto has been providing you with the advanced <br /> notification that you have requested prior to mobilization, and <br /> I expect this to continue . By copy of this letter to Alisto, I <br /> am requesting that MW-1 be brought back into service for the next <br /> monitoring report, and that the site map on the next quarterly <br /> monitoring report include all of the traffic boxes at the site. <br /> We anticipate submitting the report on or about September 1 . <br /> This will require an extension to the time frame set forth in <br /> your April 14 letter. I trust that this will be acceptable. <br />