Laserfiche WebLink
pq <br /> NMI- <br /> 2 ME01 <br /> •" 'Sm Wsi �y _ <br /> r� <br /> INT 'ATIONAL YECHNOLOGY CCRPCRAT;CN <br /> Maw- la-es."N <br /> All underground utilities�s#�a�1.1�e located before boring and drilling <br /> activities commence. <br /> V.9 AIR MONITORING <br /> Site air monitoring will be carried out to ensure that all personnel are not <br /> over-exposed to hydrocarbon vapor. The airborn hydrocarbon vapor levels will, <br /> be monitored several times each day using either a photoionization detector, <br /> (PID] or calorimetric indicator tubes. <br /> If the PID or colorimetric indicator tube samples indicate p d tate that hydrocarbon. <br /> JEM vapor levels are 50 ppm or greater, then daily personal air samples will be <br /> collected from representative project personal using charcoal tube sampling <br /> me*hods {OSHA Method MSI340). Personnel will be notified in writing of the <br /> results of any personal air samples and their significance. A copy of this <br /> report will be maintained in the employee's medical surveillance file. <br /> s V-10 ACCESS AND DECONTAMINATION <br /> 'f • <br /> # V-10.1 Access <br /> Access to the project work area zones shall be regulated and limited to <br /> t authorized persons. A daily log shall be kept of all persons entering such <br /> areas. The work area itself shall be cordoned-off using barrier tape or other <br /> suitable barriers. <br /> V.10.2 Decontamination <br /> MR Due to the low toxicity of the material involved (gasoline), the anticipated <br /> low levels of contamination, and the minimal hazard posed by any spread of <br /> contaminated soil, formai decontamination procedures will not be required. <br /> The following site requirements will be enforced: <br /> IO <br /> SER300 <br />