Laserfiche WebLink
Shop"N"Buy Market October 7,2008 <br /> 8339 East Hwy 26 Page 2 <br /> Stockton,CA 95215 <br /> 5. Adequate and suitable storage space must be provided for dry and cold storage. The <br /> following recommended methods may be used: a.) A floor area equivalent to 25 percent <br /> of all kitchen space. b.) Sufficient approved shelving of ninety-six (96) linear feet of <br /> shelving that is eighteen (18) inch deep. <br /> 6. All ice machines and bins, food preparation sinks, warewashing sinks (dishwashing <br /> units), display cases and refrigeration units, and any other food service equipment which <br /> discharges liquid waste, shall be drained by means of indirect waste pipes discharged <br /> through an air gap into a floor sink or other approved waste receptor. All floor sinks are <br /> to be positioned to be readily cleanable, accessible for inspections, and must be flush <br /> with finished floor. Do not place floor sinks inside walk in refrigeration units or cabinets <br /> [CRFC §114193 and §114193.1]. <br /> 7. Provide a complete hand washing station, with hot and cold water supplies, wall <br /> mounted fully enclosed single service hand towel dispenser, wall mounted liquid or <br /> powder hand soap dispenser, immediately accessible from the food preparation area <br /> [CRFC §113953 and §113953.2]. <br /> 8. Hot water shall be supplied at a minimum temperature of at least 120°F measured from <br /> the faucet. The water heater shall have a minimum rating of 44,000 BTU <br /> [CRFC §114192]. <br /> 9. The hand washing and food preparation sinks shall be separated from the warewashing <br /> sink or food preparation / storage areas by a metal splash guard, if separation is less <br /> than twenty-four (24) inches. Splash guard shall be at least six (6) inches in height from <br /> back edge to front edge [CRFC §113953]. <br /> 10. A noncombustible material (stainless steel, etc.) is required directly behind all cooking <br /> equipment from the bottom of the exhaust hood canopy to the top of the floor coving on <br /> all adjacent wall surfaces, and must extend six (6) inches beyond all cooking equipment <br /> edges. The exhaust hood shall also have substantially tight fitting seams and joints <br /> (welded, soldered or brazed---caulking is not accepted) [NFPA#6, CMC Chapter 4 & 5]. <br /> 11. The new well must be sampled to meet Title 22 drinking water standards for a transient <br /> non-community water system prior to issuance of the health permit. For more <br /> information, contact Adrienne Ellsaesser, Lead Senior Registered Environmental Health <br /> Specialist, at (209) 468-0343. <br /> 12. The new well must meet the water demand for the facility. <br /> 13. The old well must be destroyed under EHD permit and inspection. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br /> inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $ <br /> 105.00 per hour. <br />