Laserfiche WebLink
� � PAGE 1 OF <br /> BORING RI-A <br /> DATE DRILLE© 4-9-2001 <br /> . Western Geo-Engineers I SAMPLE INTERVAL <br /> B H L L,OG V WATER <br /> PROJECT SANCHEZ GEOLOGIST SURFACE <br /> ,GEORGE CONVERSE ELEVATION <br /> LOCATION 1904 COUNTRY CLUB DRILLER TOTAL DEPTH 17 FT <br /> STOCKTON CA VAN LEANARD <br /> DRILLING CONTRACTOR DEPTH TO CASING 4"To 17 F <br /> WOODWARD Drilling I WATER 12 feet <br /> REMARKS HAND AUGER FIRST S FEET HOLLOW STEM AUGER WITH 10"AUGERS <br /> TO 17 FOOT DEPTH. AIR MONITORING WITH MINIRAE PID WITH 10 b EV BULB. <br /> E ? Q IL o <br /> _ � <br /> C7 � <br /> T- 3 0 CORE DESCRPTION �D- REMARKS <br /> J s <br /> a- <br /> Lij <br /> m 2 <br /> cD <br /> Asphalt 2 inch thick — <br /> 41- <br /> 80 <br /> '8' Clay, brown, silty, degraded gasoline F <br /> • odor (CH-ML) <br /> ®12 Sand, silty, clayey, v <br /> fn, micaceous, <br /> wet, moderate degraded gasoline <br /> 16' odor (SM-SC) <br /> 20'- TOTAL DEPTH DRILLED 17 FT <br /> INSTALL 4" CASING <br /> NEAT CEMENT SEAL (4-9-2001) <br /> 24'- <br /> 28'- <br /> 32'- <br /> 351- <br /> 40'- <br />