Laserfiche WebLink
• <br /> WEGE WELL CONSTRUCTION LOG _ <br /> PROJECT NAME SANCHEZ MONITOR WELL NUMBER RI-A <br /> 1879 Country Club Blvd , Stockton TOP OF CASING ELEVATION <br /> PROJECTNUMBER DATECOMPLETED April 9 2001 <br /> WELLTYPE GROUNDWATER MONITORING IRECOVERYWELL <br /> REMARKS: WELL INSTALLED THROUGH 10 INCH HOLLOW STEM AUGERED <br /> BORING <br /> TYPICAL MONITORING <br /> WELL <br /> WELL CONSTRUCTION <br /> I Total Depth of hole 17 FT <br /> 2 Diameterof boring 101NCH <br /> 5 <br /> 4 8 3 Casi ng lengt 17 FEET' <br /> 4 Diameterof casing 4INCH� <br /> J5. Depth to top of screen 12 FEET <br /> 9 I <br /> 10 6 Length of scree a FEET <br /> screen interval 12'-17.0" <br /> screen type MONOFLEXF480 <br /> 3 <br /> 1 screen size 0.010" <br /> 7 Surface seal 8"TRAFFICSOX <br /> seal material CONCRETE <br /> 8 Backfill -9' <br /> seal material NEATCEMENT <br /> I 9 Upperseal 90- 11, <br /> seal material BENTONITE <br /> � Lower t0 L o e seal <br /> seat material <br /> 2 <br /> 11 Annulu <br /> material #2112 SAN® <br /> NOTE: Well constructed with poly-vinyl chloride(PVC) <br /> casing with threaded bottom cap and slip on tap cap <br /> Also,PVC steam cleaned before constructing each well <br /> Traffic boxes are watertight and locked for security <br /> I <br />