0 <br /> be used to agitate and condense the sand pack across the slotted casing interval The <br /> wells will then be purged with a truck mounted vacuum lift pump until solids have been <br /> removed from the well casing and the ground water entering through the sand pack is no <br /> longer turbid On the same day as the well is developed, the elevations of the tops of the <br /> well casings will be surveyed by a licensed surveyor to the nearest 0 01 foot and tied to <br /> an existing benchmark The surveyor will also provide rectangular coordinates for the <br /> monitor well <br /> QUARTERLY MONITORING OF WELL <br /> Depth to water measurements and groundwater samples will be collected from MW6, <br /> MW7 and R1 on a quarterly basis The groundwater samples will be analyzed for <br /> concentrations of TPH-G, BTEX, and MTBE using EPA method 8260B The results of <br /> these analyses will be included within a Quarterly Groundwater Monitoring Report for <br /> the site <br /> TASK II: PUMP TEST UTILIZING EXISTING MONITOR !TELLS <br /> The borehole logs for the existing five monitor wells and additional boreholes drilled at <br /> the site show fine silty sand of varying thickness between 15 and 30 feet bgs This <br /> aquifer is overlain by 15-20 feet of clay and underlain by an aquitard of clay extending to <br /> at least 40 feet bgs <br /> The aquifer pump test will be performed in newly installed R1 During the test a <br /> submergible pump will be placed in RI and pressure transducers will be placed in Rl, <br /> MWI, MW2, and MW3 Groundwater will then be pumped from R1 to a Baker tank at a <br /> rate of 2 gallons/minute The Baker tank will be located a sufficient distance from the <br /> pumping and recording wells to prevent the weight of the pumped water from interfering <br /> with the test results The test will be conducted over a period of three days Automatic <br /> data loggers attached to the transducers will record the groundwater elevation changes in <br /> the individual wells over the three-day period This data will be plotted and used to <br /> determine whether the aquifer is confined, semi-confined, or unconfined The appropriate <br /> calculations will then be applied to determine the storativity and transmissivity of the <br /> aquifer and the velocity of the groundwater <br /> TASK III: AIR SPARGING/ VAPOR EXTRACTION PILOT TEST <br /> INSTALLATION OF AIR SPARGING/VAPOR EXTRACTION TRENCH AND PIPING <br /> Aar spargang and vapor extraction will be conducted through horizontal PVC piping that <br /> will be installed within a trench that traverses the soil contamination plume Figure 4A <br /> shows the proposed location of the trench Figure 4B is a cross sectional view of the soil <br /> plume The dimensions of the trench will be 40 feet long by 2 feet wide by 20 feet deep <br /> 8 <br />