My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
98STOCK3.EST <br /> Tined Task Phase <br /> Costs. Units_. Rate Total Total Subtotal <br /> PHASE 4:Operations and Maintenance --- <br /> T_ask 1: Operations (cost/week) <br /> Rental <br /> _ -- --_ 1 $310 $310 <br /> Extraction Unit — -- -- " <br /> — 1 $1,027 $1,027 <br /> Vapor Abatement Unit _ _ - --- --- <br /> Injection unit 1 $150 $150 <br /> K/O pot/water pump _—_—_- $ <br /> 0.5 $75 $38 <br /> -- Sample_Pump.,PID _ _ -- ----- <br /> Labor — <br /> Technician 6 $50 $300 <br /> Engineer 1 $78 $78 — <br /> Chemist 0 1 $72 $72 - -__-- <br /> Project Manager 3 $99 $297 - <br /> Electric 1 $400 $400 <br /> Vehicle - 0.5 $75 $38 <br /> Phone 0 $50 $0 <br /> Travel Time (trips*hrs"rate) 1 3 $50 $150 <br /> analytical, discharge 0.25 $150 $38 <br /> Total Catox ops, 20 weeks 20 $2,997 $59,930 <br /> Total Carbon ops, 10 weeks 10 $1,308 $13,080 <br /> Reporting Monthly $4,890 _ _ -__- <br /> Preparation - Project Manager 40 $99 $3,960 <br /> Review 10 $93 $930 <br /> ODC $0 <br /> TOTAL SUBTASK 3 _ $77,900 <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.