My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
98STOCK3.EST <br /> Fixed Task Phase <br /> . .Costs. Units Rate Total Total Subtotal <br /> PHASE 5: Interim System Performance Evaluation _ <br /> Task 1: Interim Borings $9,319 <br /> Planning 4 $78 $312 <br /> Wells (number,depth,$/ft) 3 30 $50 $5,175 <br /> Well vaults 3 $100 5345 - <br /> geologist drilling 15 $73 $1,095 —well log drafting 5 $73 $365 <br /> -Vehicle 2 $75 $150 <br /> Phone 0 2 $50 $100 <br /> Travel Time (trips'hrs*rate) 2 3 $73 $438 <br /> per diem 2 $100 $200 <br /> analytical 3 6 $55 $1,139 <br /> Task 2: Construction $2,063 <br /> PVC pipe and ftgs 500 2 $50 $690 <br /> Instrumentation(#of wells,$) 3 $50 $173 _ <br /> Labor <br /> Technician 15 $50 $750 <br /> Electric 0 $500 $0 <br /> Vehicle 2 $75 $150 <br /> Phone 1 $50 $50 <br /> Travel Time (trips*hrs*rate) 1 3 $50 $150 - - <br /> per diem 1 $100 $100 <br /> Task 3: Reporting $582 <br /> Preparation-Project Manager 4 $99 $396 <br /> Review 2 $93 $186 <br /> Task 4: Meetings with Regulators 4 $99 $396 $396 <br /> Subtotal Phase 5 $12,359 <br /> Phase 6: Closure Activities,Demob, Final Report <br /> Task 1: Closure Activities $19,299 <br /> Planning 8 $78 $624 <br /> Confirmatory Borings (number,depth,$/ft) 3 30 $35 $3,623 <br /> geologist drilling 10 $73 $730 <br /> well log drafting 5 $73 $365 <br /> Well destruction (number,depth,$/ft) 23 30 $15 $11,903 <br /> Vehicle 3 $75 $225 <br /> Phone 0 1 $50 $50 _ <br /> Travel Time (trips*hrs*rate) 2 3 $73 $438 <br /> per diem 1 $100 $100 <br /> - ----------- <br /> analytical costs 3 6 $60 $1,242 <br /> Task 2: Site Demobilization $2,292 <br /> Labor <br /> Technician 20 $50 $1,000 <br /> Project manager B $99 $792 <br /> Vehicle 2 $75 $150 <br /> Phone 0 0 $50 $0 <br /> Travel Time (trips*hrs*rate) P e 5 3 $50 $150 <br /> per diem flo <br />
The URL can be used to link to this page
Your browser does not support the video tag.