Laserfiche WebLink
• • 614/2011) 1 25 AM PAGE: 3 of 19 <br /> Revision History <br /> REV. DATE DESCRIPTION <br /> P 03130/10 PRELIMINARY-ISSUE <br /> 0 04102110 FINAL-ISSUE <br /> 1 04107110 ADD—Internal Bottom and Shell Coating _ <br /> 2 04112110 DELETE—High Level Alarm Repairs <br /> 2 04/12110 CHANGE—Roof Access Repairs &Roof Layout Drivin <br /> 2 04/12110 CHANGE—Exterior Painting Delete Painting of entire TankL_ <br /> Job Notes <br /> "EMARM Me <br /> This Job Package describes the cleaning,inspection and repairs on Tank#7 Stockton Tank Fan,Work is to be <br /> done in accordance with API 2015,API 2016,API 653,API 650,and all BP tank specifications and procedures. <br /> 1. Before entering the tank each day,an ATW shall be Initiated and all entry and hot work permits shall be <br /> reviewed and all safety recommendations on the permits shall be followed. <br /> 2. Fall protection shall be used where applicable. <br /> 3. Paint samples shall be taken for lead testing before any welling or cutting is allowed. <br /> 4. After tank is cleaned and opened,inspect floor and shell for an internal coating. If the tank has an internal <br /> liner/watin int contractor shall sem a liner for lead. <br /> • • r A safety removal plan shall be <br /> followed prior to starling my work. <br /> aPAulhorfzMR rConrrxbr 5l hrce6Wf aP AufeMzed la fr Sr afn&Oale <br /> 5. For materials that are suspected of containing asbestos,samples shall be taken for asbestos testing before <br /> an culdn . rindin or other work is slowed. <br /> • • • A safety removal plan shall be <br /> followed prior to starting any work. <br /> BPAuer•Hm1R C•Pbacrw S/ store 60•f aPAmWh dlnx avSlgrsfun 4Ddf <br /> S. All contaminated material,material containing lead,and material containing asbestos shall be handled by <br /> personnel certified to perform such work.These materials shall be prepared,transported,and disposed at <br /> go azardous Waste Di seal facilities certified to perform such disposal, <br /> •• • •• A safety removal and disposal plan shall be followed: <br /> aP AsareHiedR rConbacrwa afm&Oaf I BPAefh.WdM xW SI Wm&Oars <br /> 1. Contractor shall furnish all materials,labor,and supervision unless noted otherwise. <br /> 2. Contractor shall provide all instruments,connections, hoses,and in ings necessary for testing and hat work. <br /> 3. After all repairs are completed,the repair contractor shall submit a final repair documentation package to the <br /> Tank Coordinator and Tank Specialist. <br /> 4. A copy of afi material lest reports(MTRs)is required.The BP Tank Group will review and document. <br /> 5. Ati welder qualifications,Welding Procedure Specifications,and Procedure Qualification Records shall be <br /> submitted to the BP Tank Group prior to starting work for approval and documentation. <br /> Stockton, • Job Package No: 1 • 1 <br />