My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • 614/201010:25 AM PAGF: 4of19 <br /> 6. Contractor shall provide as bugt drawings and forward to the Tank group.(EK.:floating roof seal,bottom <br /> patch and weld repair layout,replaced shell hula,etc.) <br /> 7. Repair contractor shall field verify all dimensions before beginning fabrication. <br /> 1. Operations shall contact the Tank coordinator when the tank is ready to be cleaned. <br /> 2. After the tank is emptied,LOTO shall be written and submitted by the Operations/Maintenance. <br /> 3. Tank shall be de-gaged by special means(vapor combustion,vapor recovery,carbon filter processing, <br /> chemical additive)d required by Federal Regulations or local requirements. <br /> 4. Tank shall be opened and contractor cleaning company shall remove remaining lank bottom sediment. <br /> S. Any leftover solid material shall be tested and placed in segregated rolloff boxes. Boxes shall be provided by <br /> Heritage and testing&disposal will be arranged by Heritage. <br /> 6. Tank cloning shall include removal of water,oil,and debris from floating roof,tank bottom,and lower shell. <br /> 1. Tank#7 will require an API 653 Out-0I-Servke inspection after the tank is cleaned.The inspection shall be <br /> completed In accordance with API 653 and SP Pipelines Inspection guideline. <br /> 2. The Inial Inspection shall be performed by BP designated contract inspectors. <br /> 3. Settlement survey of perimeter shell and internal bottom shall be performed. <br /> 4. The internal bottom,shell,welds, bottom side of floating roof,and all internal components shall be Inspected. <br /> 5. UT thickness readings shall be obtained on the bottom,cone roof,shell,and nozzles. <br /> 6. A revision to this Job Noe shall be generated after the inspection results are reviewed. <br /> 7. A schedule/timeline shall be made after Job Note is defined. <br /> External and Internal Pictures <br /> • • • After tank is completed external and internal pktures shall be taken for future records. <br /> Ultrasonic Thickners Readinas(BP Inspection) <br /> • • •• BP authorized inspector Shap take UT thickness readings on floor,shell,all nozzles,and roof. <br /> Strapping <br /> • • After all repalm are completed the tank shall be strapped. A copy of the strapping shall be sent to <br /> operattons,engineer and Inspection department <br /> Post Renoir Inspection <br /> After all repairs are performed a post-repair inspection shall be performed by the Inspection Contractor that <br /> performed the Initial Inspection.The post+epair inspection shall include Inspection of all items identifled as <br /> requiring repairs in the initial inspection.A Post-Repair Inspection Report shall verify that all repairs were <br /> completed and that the tank is fit to return to service. <br /> Wrap-Up(Final Walk Through) <br /> When this Job Note and all revisions are complete,Operations and the Tank Coordinator shall field verify that all <br /> items listed In this Job Note and revisions are satisfactorily completed and that all housekeeping is completed. <br /> The final walk through checklist shall be completed by all applicable partes. <br /> Realm to Service Checklist <br /> The Return to Service Checklist shall be completed to verify that the lank Is really to return to service and that tank <br /> Is operating as expected upon initial return to service. <br /> Stockton, • • Package No: 1 • i <br />
The URL can be used to link to this page
Your browser does not support the video tag.