My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64/201010:25 AM PAGE: 5of19 <br /> Precautionary Work <br /> 1. Use an air driven drill. Drill one(1)—114"diameter holes in bottom in the area of the lamination and at least <br /> 2 to 3 feet from the shell. <br /> 2. Locate hole 12"away from exisfing weld seams so that it may be patched by 12"circular patch and satisfy <br /> API-653 weld spacing. <br /> 3. Mark the hole location on the bottom plate with 24"circle painted with fluorescent yellow paint,centered <br /> around hole with words"HOLE"located above circle. <br /> 4. Create sketch of bottom layout that indicates location of the hole and gives dimensions with respect to the <br /> nearest bottom plate comer. <br /> 5. Test for LELs with gas detector. <br /> 6. F11111,13=1 The SP representative shall verify that the hole has been properly located,drilled,LEL tested <br /> and confirmed safe for welding. <br /> 7. If hole Is tasted and determined to be free of LEL,patch the hole as follows: <br /> a. Locate all hole that has been drilled for LEL examination. <br /> b. Prepare bottom area for patching by wire brushing plate,take care not to remove paint identifying hole <br /> location. <br /> c. Plug weld hole In bottom utilizing E7018 electrodes. Grind,wire brush and clean weld flush with surface <br /> of bottom plate. <br /> d. 0@711MMI Plug weld shall be Vacuum Box tested(VB)by the repair contractor and witnessed by a <br /> BP representative. <br /> e. Ftt-u 12"diameter A36 Modified patch plate so it is centered over hole. <br /> f. SMg2&@jW BP Representative to verify patch is centered over hole. <br /> g. Weld patch p!ate to bottom plate by means of 1l4"two pass fillet weld, utilizing E7018 or E7024 <br /> electrodes. <br /> h. • • •• The weld final pass shall be visually inspected(VT)by a BP representative, <br /> i, • r '• The weld final pass shall be Dye Penetrant examined(PT)by NDE contractor and <br /> witnessed by a BP representative. <br /> j. Patch plate fillet welds shall be tested using a vacuum box and a soap solution at a minimum negative <br /> pressure of 3 psi and a minimum holding time of 5 seconds. The complete weld joint shall be tested. <br /> k. • '• All welds shall be Vacuum Box tested(VB)by the repair contractor and witrressed by a <br /> BP re resentative. <br /> 1. • • '• All completed welds shall be visually inspected(VT)by a BP representative. <br /> 8. • • '• Contractor to verify that the hole has been located and patch completely installed to cover the <br /> hole. <br /> g, • • •• BP Representative to check the hole layout sketch,created above,to verify that the patch is <br /> conecti located and covering the drilled hole. <br /> 10. • • '• BP Representative to mark on Bottom Layout sketch the hole that has been patched. <br /> Foundation Repairs <br /> (ITEM 31 CODE 4) <br /> 1. There is no foundation seal between the external bottom edge projection and the concrete pad foundation, <br /> which allows water to run under the tank. Apply an approved sealant to the gap between the chime and the <br /> concrete pad. <br /> 2. Prior to application of the caulk,the bottom extension(chime)and the concrete surface shall be pressure <br /> washed,cleaned and prepared to provide an adequate bond in accordance with the manufacturer's <br /> recommendations. The bottom extension and the concrete ringwall shall be wire brush cleaned or abrasive <br /> blasted to provide better surface preparation that will promote strong adhesion.The sealant shall be Sherwin <br /> Williams Stampede,other approved sealant. <br /> 3. The entire perimeter of the tank shall be recaulked and sealed.The gap between the bottom extension and <br /> the concrete surface shell be completely sealed to prevent the entry of water under the tank bottom. <br /> 4, 70r •• The completed work shall be visually Inspected by a BP representative. <br /> Stockton, • • Package No: 1 • 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.