Laserfiche WebLink
DATE: <br /> . 1 1 1 0 o <br /> 10. R91111MMIThscompletad installation shall be visually inspected(Vp by a SP representative. <br /> w• <br /> Li <br /> c <br /> !MN <br /> _ Shell Nozzle and A_p u�lYenance Table <br /> Siz CL RePad RePad' WedWed Neck Thick <br /> Tall• Weld <br /> Item bevcripllon a as <br /> Ulale Witllh Haight Thick am" Thick Thick Tale spew Commenb <br /> n M in In n In In M n <br /> 1 Discharge 2 6 - - - _ - - - - 3 Threaded <br /> Coupling <br /> The data micasenied in Macau spacing when b are minlmum spacing meeaumd,H,V ar N indkeen which b minimum datanm <br /> measu"d from the npnb. (H=Hodcartal WeW,V=Ver ieal Wekl,N=Nozda Weld.) <br /> CW=Comeweld, AR=Repadcf Nem A, A=WeldcfKw A. HW=H cnu1Wa1d. VW=VenicalWeH, TS=Tamsblons Type Roped <br /> <S> 00Q0ElED 000 <br /> 6 C b E F 0 <br /> Shell Coupling Replacement with 2" Nozzle <br /> (ITEM 7/CODE 5) <br /> 1. There is one(1)existing 1-114•threaded Shell Coupling"le-which shall be removed and replaced with a 2= <br /> flanged nozzle.The installation shall comply with API-653 and API-650 weld spacing requirements.The <br /> installation shall comply with API-650 Figure 5-6. <br /> 2. The 2"flanged nozzle connection to the tank shall be installed in accordance with API-550 Figure 5-8.The <br /> nozzle neck shall be welded on both inside and outside of the tank shell. <br /> 3. Paint shall be removed from the area where cut out is to be made. <br /> 4. The tank shell cut out shall match that of the nozzle size with proper allowance for weld fit-up In accordance <br /> with the a oved welding procedure.The nozzle shall be tacked in place. <br /> 5, • •• The fit-up of the nozzle shall be visually inspected(VT)by a BP representative for compliance <br /> with the approved welding procedure. <br /> B. All nozzle-to-shell welding shall be full fillet welded complete fusion and complete penetration utilizing E7018 <br /> electrodes.The nozzle shag be welded both internally and externally The fillet sae shall be as shown in the <br /> attached drawing. Note that the Internal weld shall be flush with the Internal shell to prevent damage <br /> to floating roof seals. <br /> 7. Nozzle-to-Shell Weld Testing and Inspection. <br /> a. • e : • The completed initial weld shall be visually inspected(VT)by a BP representative. <br /> b. • e • The completed final weld shall be visually inspected(VT)by a BP representative. <br /> Stockton, e Job Package No: 1 • 1 <br />