Laserfiche WebLink
a • 6W201010:25 AM PAGE- 16of19 <br /> P99 NYGIE <br /> 7/Ir <br /> Dta x)m• <br /> Aar PLATE <br /> 1t <br /> L-L <br /> ••X1m'A36 R.PTE <br /> awAXFTEtxtm• <br /> A36PRp$ <br /> Fixed Roof Handrail Repairs (ITEM 18 1 CODE 4) <br /> 1. The existing fixed roof handrails are halted to the top angle. The south and west handrail posts have base <br /> holes that are open to the tank which permits emissions to leak out and moisture to penetrate inside.The <br /> existing handrails shall be modified to replace all the halted hearing pads on the bottom of the handrail posts <br /> with new 114"thick minimum e"diameter A-36 plate that is seal welded all around with a full and complete <br /> 3116"fillet weld.The new hearing pads shall be sized and positioned to completely cover any existing bolt <br /> hales throw h the roof plate ar the top angle. <br /> 2. • • -• All completed welds shall be visually inspected(VT)by a BP representative. <br /> 3. • • -• The completed repair shall be visually Inspected(VT)by a BP representative. <br /> Access Ladder Repairs (ITEM 19 1 CODE 5) <br /> 1. There is no safety chain or drop bar at the top of the access ladder onto the fixed roof.A safety drop bar or <br /> chain shall be installed at the top of the access ladder. <br /> 2115,1110 -• The completed repair shall be visually inspected(VT)by a BP representative. <br /> Stockton, a • Package No: 1 • • 1 <br />