My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: 1 1 1 <br /> Miscellaneous Fixed Roof Repairs <br /> Gauge Hatch Repairs (ITEM 141 CODE 6) <br /> 1. The existing gauge hatch is missing a seal.A new compatible seal shall be installed in the gauge hatch or the <br /> existin hatch shall be removed and replaced with a new hatch included a seal. <br /> 2. 1 -• The completed repair shall be visually inspected by a BP representative. <br /> Tank Gauge System & High Level Alarm System Repairs <br /> Tank Gauge Svstem Repairs <br /> 1. The tank gauge system shall be serviced in accordance with manufacturer's recommendations.The gauge <br /> float, elbow sheaves, and cable shall be inspected, serviced, repaired and replaced as required.The entire <br /> system shall be serviced in accordance with the manufacturer's recommendations. <br /> 2. The tank au a system shall be checked for proper operation. <br /> 3. 1 -• The completed work shall be visually inspected by a BP representative. <br /> High Level Alarm System Rsoairs <br /> 1. The Level Detector and High 1 High-High Level Switches shall be serviced In accoroance with manufaolurers <br /> recommendations. The detector and switches shall be inspected, serviced, repaired and replaced as <br /> required.The entire system shall be serviced in accordance with the manufacturers recommendations.This <br /> work shall be performed by Others. <br /> 2. The Level Detector and switches shall be checked for proper operation by Others. <br /> 3. WROMi The completed work shall be visually inspected by a BP representative. <br /> Miscellaneous Structural Repairs <br /> Roof Access Repairs (ITEM 171 CODE 5)(CHAHGE—Rev.1) <br /> 1. The existing caged ladder is comingled with the existing roof handrails resulting in an awkward and unsafe <br /> access to the fixed roof. The existing handrails and the top part of the caged ladder shall be modified to <br /> widen the passage way from the ladder to the fixed roof to provide safe and convenient access to the fixed <br /> roof.The existing handralls shall be modified as required to complete the work. <br /> 2. The enclosed walking surfaces to access roof n=Ies shall be inspected to determine if the roof plate is <br /> sound enough for people M walk on. <br /> 3. 21fir,111-MR The roof surfaces shall be visually inspected(VT)by a BP representative. <br /> 4. The wing handrail shall be as specified and shown below: <br /> a. Handrail Height 42' <br /> b. Handrail Posts 2-112"x 2-112"x 114'Angle,A-36 @ 96"or less <br /> C. Top rail and Mklrail 2-1/2"x 2-12'x IWAngle,A.36 <br /> d. Michail 2.112"x tl4"Flat Bar,A-36 <br /> e. Toeboard 1l4"x 4' Flat Bar,A-36 <br /> 5. A minimum 6'diameter x W A36 bearing pad shall be installed and seal welded at all connections to the tank <br /> roof. <br /> 6. • 1 •1 All completed welds shall be visually inspected(VT)by a BP representative. <br /> 7. 1 -• The completed repair shall be visually Inspected(VT)by a BP representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.