Laserfiche WebLink
DATE: 614J201010:25 Afill PAGE: 18cf19 <br /> Internal Bottom and Shell Coating <br /> (ADD—Rev.1) <br /> 1. The lower 36"of the internal shell and the bottom shall be coated with 24 mils DFT Sherwin Williams Dura- <br /> Plate UHS Tank Lining System.Refer to the attached Sherwin Williams'Insta/htion Procedure for Dum- <br /> PhO UHS Encut for recommended preparation and application procedures. <br /> 2. The BP representative shall arrange to have an independent NACE Level til Inspectorpresent to <br /> Ins act Me surface preparation,coating application and coating curing. <br /> 3. ME=Verification of Independent NACE Level III Inspection witnessed by the BP representative. <br /> 4. The surfaces and joints to be coated shall be fabricated and prepared in accordance with NACE Standard <br /> RP-0178(latest Edition)"Design,Fabrication, Surface Finish Requirements and Proper Design <br /> Considerations for Tanks and Vesseis to be Lined for immersion Service." <br /> a. All rough welds shall be ground to remove sharp edges undercuts,pinholes and other such <br /> Irregularities.Chipping can be used to remove sharp edges if followed by grinding. <br /> b. Sharp edges and fillets shall be ground to a smooth radius of 114'to 118 .Surfaces shall be free of <br /> gouges,deep scratches,slivered steel and other surface flaws. <br /> C. Surfaces to be lined shall be free of wax or grease pencil marks,gouges,handling marks,deep <br /> stretches,metal stamp marks,silvered steel or other surface flaws.Any flaws shall be repaired by <br /> solved cleaning,welding with E701 B 1 E7024 or grinding as required. <br /> d. All wells to be lined shall meet the minimum requirements of NACE Weld Precaretion Desionatron"C" <br /> as defined in NACE RP-0178. <br /> 5. Prepare the surface for application of the internal coating. <br /> a. Remove all oil and grease from surface by Solvent Cleaning per SSPC-SP1. <br /> It. Sandblast tank bottom and lower shell to Near White Metal Sint Cleaning SSPC-SP70I NACE 2. <br /> Blast clean all surfaces using a sharp,angular abrasive for optimum surface profile,2.3 mil profile. <br /> C. Remove all weld splatter.The surface to be primed must be clean,dry,and in sound condition. <br /> Remove all oil,dust,grease,dirt, loose rust,and other foreign material to ensure good adhesion. <br /> d. Clean sandblast material and other debris from prepared surface. Remove and dispose of waste <br /> material in approved containers. <br /> e. Prime an bare steel the same day as t is cleaned or before gash rusting occurs. <br /> I. • , - , Verification of the visual examination(Vn surface preparation is to specified surface <br /> finish,cleanliness,dryness,and readiness for application of the coating by the BP representative. <br /> S. The SP representative shall verify that the installation conforms to the General Requirements of the <br /> 'Installation Procedure for Dura-Plate UHS ED I. <br /> a. Temperature,air movement,relative humidity and dew point <br /> b. Material handling,storage and preparation, <br /> C. Observance of all safety precautions. <br /> 7. • • •e Verification of the compliance with all General Requirements by the BP representative <br /> B. The specified Primer shall be applied as required following surface preparation. <br /> g, • • •• The SP representative shall confirm application of Primer as specified. <br /> 10. The Detail Cost shall be applied as required following the application of the Primer. <br /> 11. Prellor-UM The BP representative shall confine application of the Detail Coat as specified. <br /> 12. The Medium Film Lining(First Coati shall be applied as required fcbvring the application of the Detail Coat <br /> 13. • '• The SP representative shall confirm application of the Medium Film Lining(First Coat)as <br /> specified. <br /> 14. Ali of the specified Inspection shall be performed and documented following the application of the Medium <br /> Film Lining(First Coal): <br /> a. Visual Inspection. <br /> b. Film thickness measurement <br /> C. Hardness Testing. <br /> d. Holida Detection. <br /> 15. 0 • -• The BP representative shall confirm that all Inspection of the Medium Film Lining(First Coal) <br /> was performed as specified and documentation is provided. <br /> 16. llrelllr -• The BP representative shat mark defects and unacceptable coating with chalk for repair. <br /> 17. The coating shall be repaired as the result of defects,unacceptable visual inspection or dry film thickness <br /> measurement Repairs shall be performed in accordance with the specifications.Any repairs shall be <br /> performed,cured, inspected and tested in accordance with above and vedfied as Indicated. <br />