Laserfiche WebLink
DATE: 614f201010:25 AIVI PAGE: 19 of 19 <br /> 18. 111713' The BP representative shall confine that the coating was repaired and inspected as specified. <br /> 19. The Second Coat shall be applied as required following the application of the First Coal. <br /> 20. ffrel , •• The BP representative shall mnfirm application of the Second Coat as specified. <br /> 21. All of the specified Inspection shall be performed and documented following the application of the Second <br /> Coat: <br /> a. Visual inspection. <br /> b. Film thickness measurement. <br /> c. Hardness Testing. <br /> d. Halide Detection. <br /> 22. • • The BP representative shall confirm that all Inspection of the Second Coat was performed as <br /> s cified and documentation is provided. <br /> 23. • • ' The BP representative shall mark defects and unacceptable coating with chalk for repair. <br /> 24. The coating shall be repaired as the result of defects, unacceptable visual inspection or dry film thickness <br /> measurement. Repairs shall be performed in accordance with the specifications.Any repairs shall be <br /> rlormed,cured,inspected and tested in accordance with above and verified as indicated. <br /> 25. • • The BP representative shall confirm that the coating ores repaired and inspected as specified. <br /> 26. Frs . •• Verification of the Final Acceptance of the coating by the BP representative. <br /> Exterior Painting <br /> 1. There is significant coating failure over 30 percent on the tank external surface with several areas where the <br /> paint has peeled off and there is active surface corrosion. The coating has chipped off mostly around the <br /> manway and nozzles,no pitting was noted in these areas during this inspection.The first course of the tank <br /> shell and nozzles shall be blasted.cleaned and mmated.The remainder of the tank shall be spot recosted <br /> as required. (ITEM 1 I CODE 5)(REM 21 CODE 4)(CHANGE—Rev.1) <br /> 2. There Is surface corrosion on the mamlay and reinforcing pad where the mating has failed but no pitting. <br /> These areas shall be cleaned and mounded. (ITEM 61 CODE 3) <br /> 3. The shell nozzle(suction)is in fair condition with no significant internal corrosion,but there is surface <br /> corrosion around the external nozzle where the coating has peeled off.These areas shall be cleaned and <br /> remated. (ITEM8ICODES) <br /> 4. The mating on the fixed roof is in poor condition with several areas where the mating has chipped off and <br /> exposed the bare metal. These areas shall be cleaned and remated. (ITEM 131 CODE 4) <br /> (ITEM 201 CODE 5) <br /> S. All exterior areas where the repairs were made and the coating has failed shall be removed and rematetl. <br /> S. Coating shall be applied to BP painting specification BPPL-SP-102,system 1 or 2. <br /> 7. Damaged/failed areas of the tank mating shall be receated: <br /> a. Remove all oil and grease from surfaces by Solvent Cleaning per$SPC-SP1 <br /> b. Abrasive blast the areas to Commercial Blast Cleaning SSPC-SP6 f NACE 3. <br /> c. The surface to be primed must be clean,dry,and in sound condition.Remove all oil,dust,grease,dirt, <br /> loose rust,and other foreign material to ensure good adhesion. Prime any bare steel the same day as it <br /> is cleaned or before flash costing occurs. <br /> it. Clean abrasive blast material and other debris from prepared surface.Remove and dispose of waste <br /> malenal th ap roved containers. <br /> e. ggL%AQ*&gU Verification of the visual examination(VT)surface preparation is to specified surface <br /> finish,cleanliness,dryness,and readiness for application of prime coat by the BP representative. <br /> 8. Roller apply the coating to the recommended film thickness and allow to dry property.The completed mating <br /> shall he visually examined(VT)and dry film thickness shall be measured. <br /> a, • . •• Verification of the visual examination(VT)of mating application and Dry Film Thickness <br /> measurement by the BP representative. <br /> Attachments <br /> 1. BPPL-SP402 Painting of Tanks,Station Appurtenances and Aboveground Piping <br /> 2. Sherwin Williams Installation Procedure for Dura-Plate UHS Epoxy <br /> 3. Sherwin Williams Technical Data Pages for STP 06-104 Tank Lining Specifications <br /> 4. Excerpts from NACE RP-0178 <br /> Stockton, • • Package No: 1 • 1 <br />