Laserfiche WebLink
L Complete the Tank-Repair,Alteration,or Reconstruction Data Sheet shall be completed no less <br /> chant week of completion of repairs.This form shall he filled out as much as possible from the <br /> repair contractor then forward to the Tank coordinator for review then forward to the BP Tank <br /> Inspection Authority for signoff.And record keeping. <br /> > A copy of all MTR's shal I be£onward to the Tank Inspection Authority. <br /> r Each contractor shall submit Beld construction drawings prior to starting any repairs for approval <br /> and submit final as-built drawings within I week after all mechanical repairs. <br /> Final reports should consist of 3 sets of paper copies and 3 sets of CDs per tank.(1)Set for <br /> Temtinal Site,(1)Set for John Carrell,(1)Set for Michael Molina <br /> r}.:r R7_II—i <br /> Required: Yes M No❑ <br /> • Job representative is responsible for gathering documentation for all the above mentioned items <br /> and a copy paper shall be left on site, <br /> • Job representative is responsible for making sure that the repair contractor sign off the required <br /> inspection!fold points during mechanical repairs. Refer to the NDE inspections package. <br /> • If tank requires hydro test a BP representative and/or designee shall witness and complete the BP <br /> hydro test form. Completed fermis shall be located in thejoh box olid a copy forward to the BP <br /> Tank Inspection Authority. <br /> • A copy of the return to checklist shall be completed and signed prior to return the tank back to <br /> service. <br /> Required: Yes® No ❑ <br /> • Coating contractor shall follow the USPL STP 06-102 coating specifications. <br /> • A final inspection report shall be completed by the coating contractor per BP specifications prior <br /> to leaving the site. A copy shall remain at the site_A final copy shall be forward to the Tank <br /> Inspection team for review before returning the tank back to service. <br /> • A final completion letter shall be filled out by the coating contractor and forward to thejob <br /> representative and I ank coordinator. A copy shall also he forward to the'I'ank Inspection Team <br /> prior to returning lank by to service. <br /> Required:Yes❑ No <br /> Floating roof seal contractor shall have all approved drawing and material list prior to starting <br /> any work <br /> o A final completion letter shall be filled out by the coating contractor and forward to the job <br /> representative and Tank coordinator. A copy shall also be forward to the Tank Inspection Team <br /> prior to returning tank by to service. <br /> 1 ril r :n '.. 1 <br />