Laserfiche WebLink
r . r t : <br /> — - --WlI?1ZJUZLV2fl41 get . - <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes No <br /> After all repairs are performed,a post-repair Inspection shall be performed by the Inspection Contractor that <br /> performed the initial inspection.The post-repair inspection shall include inspection of all items identified as <br /> requiring repairs in the initial inspeclion.A Post-Repair-Inspection Report shall verify that all repairs were <br /> completed and that the lank is fit to return to service.Post impaction shall consist or below documentations. <br /> Initial Out-ofService inspection report: All inspection recommendations shall be completely <br /> filled out on the inspection recommendation forms. If inspection recommendations are not noted <br /> on the repair job package each item shall be addressed by the SP Tank Specialist of the BP Tank <br /> Impaction Authority before signing off. <br /> Repair Job Package:A copy of the Repair Job Package will be attached for reference if required <br /> during the post inspection. The job package shall be reviewed to determine that all items were <br /> noted an the NDE Inspection Package and d any additional repair items were added. <br /> NDE Inspection Package: Inspection contractor shall complete the NDE requirements as noted <br /> In the inspectian package. If Items in the inspection package require NDE by the repair contractor <br /> the inspection contractor shall witty and show all acceptable documentations. If repair contractor <br /> performed any NDE and documentation Is not available the Inspection contractor can not signori <br /> and shall notify the Job Representative and the Tank Coordinator. <br /> Note: If any new noades,new floor or reef Is added Ultrasonic thickness base line readings shall <br /> be taken and documented. <br /> All reporting noted above shall be completed on site with the TLR reporting lool and shall be downloaded to a FTP <br /> site as noted by BP Tank Inspection.The Be Tank Inspection Authority will review all documentation for <br /> completion prior to returning tank back to service. <br /> POST INSPECTION REQUIREMENTS (Inspection Contractor) <br /> Required: Yes M No <br /> Tank Strapping <br /> After all repairs am completed the tank shall be strapped prior to hydra testing A copy of the strapping shall be <br /> sent to operations,engineering and inspection department. Strapping shall be completed in three(3)days or less. <br /> POST INSPECTION REQUIREMENTS(Inspection Contractor) (BP Form) <br /> Required: Yes No <br /> Inspection recommendations from the Initial Inspection <br /> AIL inspection recommendations from the initial inspection report shall be completed at this time. All <br /> items shall be addressed and signed offprior to approving the final report. When completing the <br /> inspection recommendation the inspection contractor shall fill the section"Corrective Action <br /> Performed". The BP Tank Inspection Authority will complete the Section"Authorized Inspection <br /> Notes". <br />