Laserfiche WebLink
, .TE: 512412010 8 <br /> Revision History <br /> REV. DATE I DESCRIPTION <br /> P 0MUMD PRELIMINARY-ISSUE <br /> 0 04/02/10 FINAL-ISSUE <br /> 1 0410711 D ADD—Internal Bottom and Shell Coafin <br /> 204/12/10 DELETE—High Level Alarm Repairs <br /> 2 04117/70 CHANGE—Roof Access Repairs &Roof Layout Drewtng _ <br /> 2 1 04112110 CHANGE—Exterior Painting(Delete Painting of entire Tank) _ <br /> Job Notes <br /> This Job Package describes the cleaning,inspection and repairs on Tank#7 Stockton Tank Farm.Work is to be <br /> done in accordance with API 2015,API 2016,API 653,API 650,and all BP lank specifications and procedures. <br /> MN t <br /> 1 Before entering the tank each day,an ATW shall be initiated and all entry and hot work permits shall be <br /> reviewed and all safety recommendations on the pormits shall be followed. <br /> 2. Fall protection shall be used where appkcabie. <br /> 3. Paint samples shall be laken for lead testing before any welding or cutting is allowed. <br /> 4. After tank is cleaned and opened,inspect floor and shell for an internal Posting.If the tank has an internal <br /> liner/coattirm,Paint contractor shall sample liner for lead. <br /> T , gi r.4v_ ?] A safety removal plan shall be <br /> followed prior to starting any work. <br /> /�Lalning <br /> BP Job Representative:Jab Rea copy on site. <br /> 5. For materials mat are suspected of sbestos,samples shall be taken for asbestos testing before <br /> an cutting,grinding or other work is allowed. <br /> _ W)= - A safety removal plan shall be <br /> followed prior to starling any work. / <br /> BP Job Representative:Job Rep shall have a copy on site <br /> 6. All contaminated material,material containing lead,and material conte'ning asbestos shall he handled by <br /> personnel certified to perform such work.These materiels shall be prepared,transported,and disposed at <br /> approved Hazardous Waste Dls ossl facilities ted to perform such disposal. <br /> A satatV r mov nd disposal plan shall be followed: <br /> BP Job Representative:Jab Rep all ve a copy on site. <br /> 1. Contractor shall furnish all materials,labor, and supervision unless noted otherwise. <br /> 2. Contractor shall provide all instruments,confections,hoses,and fittings necessary for testing and hot work. <br />