My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, .TE: 512412010 8 <br /> Revision History <br /> REV. DATE I DESCRIPTION <br /> P 0MUMD PRELIMINARY-ISSUE <br /> 0 04/02/10 FINAL-ISSUE <br /> 1 0410711 D ADD—Internal Bottom and Shell Coafin <br /> 204/12/10 DELETE—High Level Alarm Repairs <br /> 2 04117/70 CHANGE—Roof Access Repairs &Roof Layout Drewtng _ <br /> 2 1 04112110 CHANGE—Exterior Painting(Delete Painting of entire Tank) _ <br /> Job Notes <br /> This Job Package describes the cleaning,inspection and repairs on Tank#7 Stockton Tank Farm.Work is to be <br /> done in accordance with API 2015,API 2016,API 653,API 650,and all BP lank specifications and procedures. <br /> MN t <br /> 1 Before entering the tank each day,an ATW shall be initiated and all entry and hot work permits shall be <br /> reviewed and all safety recommendations on the pormits shall be followed. <br /> 2. Fall protection shall be used where appkcabie. <br /> 3. Paint samples shall be laken for lead testing before any welding or cutting is allowed. <br /> 4. After tank is cleaned and opened,inspect floor and shell for an internal Posting.If the tank has an internal <br /> liner/coattirm,Paint contractor shall sample liner for lead. <br /> T , gi r.4v_ ?] A safety removal plan shall be <br /> followed prior to starting any work. <br /> /�Lalning <br /> BP Job Representative:Jab Rea copy on site. <br /> 5. For materials mat are suspected of sbestos,samples shall be taken for asbestos testing before <br /> an cutting,grinding or other work is allowed. <br /> _ W)= - A safety removal plan shall be <br /> followed prior to starling any work. / <br /> BP Job Representative:Job Rep shall have a copy on site <br /> 6. All contaminated material,material containing lead,and material conte'ning asbestos shall he handled by <br /> personnel certified to perform such work.These materiels shall be prepared,transported,and disposed at <br /> approved Hazardous Waste Dls ossl facilities ted to perform such disposal. <br /> A satatV r mov nd disposal plan shall be followed: <br /> BP Job Representative:Jab Rep all ve a copy on site. <br /> 1. Contractor shall furnish all materials,labor, and supervision unless noted otherwise. <br /> 2. Contractor shall provide all instruments,confections,hoses,and fittings necessary for testing and hot work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.