My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During the post inspection verify if a Sand Analysis was performed if so make sure the report is in the file job box. <br /> Attach a copy to the post inspection report in the TLR.Reporting Tool. <br /> Table of Contents <br /> RevisionHistory.......................................................................................................................8 <br /> JobNotes..................................................................................................................................8 <br /> PrecautionaryWork...............................................................................................................11 <br /> FoundationRepairs...............................................................................................................13 <br /> BottomPatching(Critical Zone)...........................................................................................13 <br /> Gauge Float Cable Attachment Pad.....................................................................................18 <br /> Discharge Shell Nozzle Replacement..................................................................................20 <br /> Shell Coupling Replacement with 2"Nozzle.......................................................................22 <br /> Shell Nozzle Telltale Holes....................................................................................................24 <br /> New Thermal Relief Assembly..............................................................................................25 <br /> NewPipe Support..................................................................................................................29 <br /> Painter's Hitch........................................................................................................................31 <br /> Miscellaneous Fixed Roof Repairs.......................................................................................32 <br /> Tank Gauge System &High Level Alarm System Repairs.................................................32 <br /> Miscellaneous Structural Repairs........................................................................................33 <br /> Internal Bottom and Shell Coating.......................................................................................37 <br /> ExteriorPainting..._......................._......................................................................................41 <br /> Attachments...........................................................................................................................42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.