My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
FIELD DOCUMENTS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:42:38 PM
Creation date
6/21/2019 1:19:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 July 2012 <br /> AGE-NC Project No.96-0236 <br /> Page 4 of 13 <br /> Sampleswere submitted to Cal-Tech Environmental Laboratories forthe constituents listed <br /> in section 3.1. <br /> 4.0. FINDINGS <br /> Field measurements and laboratory analyses of ground water samples were utilized to <br /> evaluate the effectiveness of the ISCO pilot test injections. <br /> 4.1. FIELD PARAMETERS <br /> Baseline field parameters were collected on 13 January 2012. Additionally, progress field <br /> parameters were collected during each ISCO injection event (ISCO Injection Event Nos. <br /> 1-4), while post-ISCO injection field parameters were collected on 25 April 2012, and on <br /> 02, 09, 16 May 2012. Field parameters collected during the baseline, progress and post- <br /> ISCO injection are summarized in Table 2. <br /> 4.1.1. Baseline Field Parameters Results <br /> On 13 January2012,field parameters as described in section 3.1 were collected from wells <br /> MW-1A, MW-2, MW-5, MW-9, DPE-1 and DPE-2 as part of a baseline ground water <br /> monitoring event prior to the pilot study injections (Table 2). The following is a summary <br /> of the results: <br /> • Depth to ground water measurements ranged between 9.90(DPE-1)feet below the <br /> top of the well casing (btoc; DPE-1) and 11.91 feet btoc (MW-5); <br /> • pH ranged from 6.71(MW-9) to 7.06 (MW-5); <br /> • Specific Conductivity(SC) ranged from 859 micro siemens per centimeter(NS/cm; <br /> MW-2) to 1,204 pS/cm (MW-9); <br /> • Temperature ranged from 20.2 (MW-5) to 23.0 degrees Celsius (°C; DPE-2); <br /> • Dissolved oxygen (DO) ranged from 1.54 (DPE-2)to 3.47 milligrams per liter(mg/l; <br /> MW-2) and from 17.1 to 38.1 percent (%), respectively; <br /> • Oxygen reduction potential (ORP) ranged from -286.9 millivolts (mV; MW-1A) to <br /> -72.2 mV (MW-5); <br /> • Salinity ranged from 0.70 (MW-2) to 1.19 (MW-9); and <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.