My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 5:10:28 PM
Creation date
6/21/2019 3:11:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
enviros, <br /> Request for Well Down-gradient of Well MW-4 <br /> In response to your request for a well down-gradient of Well MW-4, we propose to move <br /> the well which was originally proposed by Fugro on the St. Bernadette's Church property. <br /> The proposed well would be moved to the northeast of MW-4. This is appropriate for <br /> several reasons: <br /> • This would place the well down-gradient from Well MW-4 and source areas on the <br /> Shell site. <br /> • The location originally proposed by Fugro for the well is in fact inaccessible due to <br /> the presence of trees. <br /> • This proposed location remains on the St. Bernadette's property, thus no additional <br /> right of entry agreements will be necessary. <br /> Status of Right of Entry and Encroachment Agreements <br /> Right of entry for the St. Bernadette's Church property has been granted. <br /> Application for encroachment permits was made to the City of Stockton on July 23, 1996. <br /> They replied with a request for a certificate of insurance from Shell. Since Shell is self- <br /> insured, documents verifying financial responsibility were forwarded to the city on <br /> September 23, 1996 to address the insurance requirement. We have not yet received a <br /> reply from the city as to whether this information was sufficient to meet their requirements. <br /> Upon receipt of the encroachment permit,copies of it and the right of entry agreement will <br /> be forwarded to you along with appropriate SJCPHS well permit applications and fees for <br /> permitting of the wells. <br /> If you have any question, please call me at (707) 935-4852. <br /> Sincerely <br /> Env�irj�s,, I <br /> Diane M. Lu quist, P.E. <br /> Senior Engineer <br /> cc: Mr. R. Jeff Granberry, Shell Oil Products Company <br /> Ms. Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br /> 371 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.