My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 5:10:28 PM
Creation date
6/21/2019 3:11:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�law <br /> ,t <br /> NFA Th <br /> Go CROTHE <br /> &SMmH May 8, 1995 <br /> A R C H I T E C T S <br /> 1029 16th Street <br /> Modesto,CA 95354-1105 <br /> 2091578-0636 Ms. Mary Meays <br /> Fax:209/578-0798 Senior Registered Environmental <br /> Health Specialist <br /> Public Health Services <br /> San Joaquin County <br /> P.O. Box 388 <br /> Stockton, CA 95201-2009 <br /> Dear Mary, <br /> It was a pleasure to talk to you this afternoon about the proposed <br /> expansion of the St. Bernadette Catholic Church and the on-going <br /> remediation activity on the adjacent Shell Service Station site. <br /> I have enclosed a copy of the overall church site plan and a floor <br /> plan of the proposed expansion and ask that you review these documents <br /> and inform me if the scope of our proposed construction will be affected <br /> by the remediation activity on the Shell site. A construction schedule <br /> may be developed that will call for construction activity to begin within six <br /> to nine months. Please note that the proposed project extends to within <br /> five feet of the property line shared by the Church and the Service <br /> Station. I look forward to your response. <br /> Sin I <br /> James D. Grothe <br /> JDG:jb 95-08 <br /> Enclosure <br /> cc: Father Moore <br />
The URL can be used to link to this page
Your browser does not support the video tag.