My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 5:10:28 PM
Creation date
6/21/2019 3:11:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
low <br /> Si a actio <br /> Advantages • Effectively treats large volumes (>1,000 cu yd) of soil <br /> • Removes contamination near or under fixed structures <br /> • Causes minimal disruption to business operations <br /> • Removes volatile contaminants from the zone of water <br /> table fluctuation <br /> Limitations • Effectiveness limited in heterogeneous soils or soils with _ <br /> - high clay or organic content <br /> •`Airflow may not contact all parts of soil <br /> • Leaves residual constituents in soil <br /> • Might require air discharge permits <br /> System • Vertical or horizontal extraction wells <br /> Components a Trenches <br /> Vacuum blower or pump <br /> • Ir{jection and passive inlet wells <br /> • Aboveground vapor treatment equipment(optional) <br /> Wastestreant 0Vapor treatment options (if needed): <br /> Treatment - vapor phase biordter' <br /> Granulated activated carbon <br /> - Internal combustion engine , <br /> Catalytic oaddation unit , <br /> Thermal incinerator.. <br /> Parameters to • _Vapor concentration - . - <br /> Monitors e-Airflow rate <br /> Cleanup Levels Can remove 90% of volatile organic compounds (VOCs) <br /> and Timing2 and semivolatile organic compounds (SVOCs) <br /> • For an ideal site,90%in 6 months to 1 year <br /> • For an average site', 90%in 6 months to 3 years <br /> • Longer time required for heterogeneous soils and less <br /> volatile constituents <br /> Costso For an ideal site3, $40,000 to $120,000 <br /> • For an average site, $100,000 to $150,000 <br /> • Vapor treatment costs can drastically affect total costs <br /> 'Varameters b mmitar•are�«pafartnanee putposee ardy,canpranee 9 paremdets�'M�& - - <br /> Cleanup star&rds are deternted by the sate. - - <br /> %9desl sde'assumes no delays n oonedNe action and a reWvey homagate m permeable aiMuface. - - <br /> 4An'awsapsle asames mFwW delays nomo* wlim ada modeiasyheteagm®us ad pameehlay^•Flace <br /> tools=we Kopmerit and operatbn and maiaenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.