Laserfiche WebLink
Mike Infuma EH <br /> From: Scott Bittinger[sbittinger@stratusinc.net] <br /> Sent: Thursday, May 10,2007 2:35 PM <br /> To: Mike Infurna [EH] <br /> Cc: gkowtha@stratusinc.net; adudding@stratusinc.net <br /> Subject: work schedule, USA Station 835, Country Club Boulevard <br /> Hi Mike, how are you doing? <br /> Here is a tentative schedule for the work at this site. We should be able to complete the <br /> majority of the work, with the exception of the drilling of <br /> MW-15 and MW-16. These wells will be installed once we obtain a Cal Trans encroachment <br /> permit. <br /> Drilling of well MW-17 with limited access auger rig: Friday, May 18 Drilling of sonic <br /> wells MW-12 through MW-14, MW-18, MW-19, and MW-21: begin Monday May 21 <br /> Note that we will have the drilling contractor use 8 5/8" ID steel casing for the sonic <br /> borings, not the 6 5/8" ID casing. Centralizers will be used within the sonic casing. <br /> E-mail or call me at (530) 676-2062 with questions. <br /> Scott <br /> 1 <br />