My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:51:32 AM
Creation date
6/25/2019 8:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> CONDOR EARTH TECHNOLOGIES.INC. <br /> HEALTH A2iD SAFETY PROCEDURES <br /> For <br /> Libbey Owens Ford Co. <br /> 500 East Louise Avenue <br /> Lathrop, California <br /> San Joaquin County <br /> Condor Earth Technologies, Inc. (Condor) has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered during earthwork and <br /> drilling operations. <br /> The trench excavation will be performed by a qualified contractor familiar with the excavation <br /> of petroleum hydrocarbon impacted soil. Contractor personnel will be responsible for all excavation <br /> safety issues and for adhering to standard safety procedures during all earthwork activities. <br /> The drilling will be performed by Spectrum Exploration of Stockton, California. Spectrum <br /> personnel will be responsible for all drilling safety issues and for adhering to standard safety <br /> procedures during all drilling activities. V <br /> All work will be done in accordance with current OSHA regulations and all personnel working <br /> within the exclusion zone will have completed a 40-hour OSHA training course and be current with <br /> required refresher courses. A tailgate safety meeting will be held prior to commencement of work <br /> each day and a site-specific Health and Safety Plan will be discussed with and presented to all crew <br /> members for their signatures. <br /> 1.0 - SITE ACCESS <br /> Access to the project site shall be limited by the site perimeter (minimum of 30 feet). In no <br /> case shall the exclusion zone for all non-authorized personnel be less than 30 feet from the <br /> trenched area or drill rig. No smoking will be allowed in the exclusion zone. <br /> 2.0 - SITE NIANAGER <br /> The site manager shall coordinate all activities of equipment and personnel at the project site. <br /> Site manager responsibilities will include the following: <br /> a. Limiting access within the site perimeter to authorized personnel. <br /> b. Providing written log of on-site activities and events. <br /> C. On-site containment of potentially contaminated soil and water. <br /> d. Monitoring ambient air vapor concentrations on the site perimeter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.