My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:51:32 AM
Creation date
6/25/2019 8:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Notification of regulatory agencies during emergency procedures. <br /> f. Enforcement of site safety precautions. . <br /> 3.0 - PERSONAL PROTECTIVE EOUIPINIE`IT <br /> During excavation or drilling in soils containing organic vapors and liquid contaminants, all <br /> personnel shall undertake the following precautions: <br /> 3.1 Skin/Clothes Protection <br /> a. Hard hats, steel-toed rubber boots, and suitable gloves will be worn at all times. <br /> b. Disposable plastic gloves will be worn for sampling (if required) and changed after <br /> each sample. <br /> c. Disposable protective clothing will be wom as warranted. <br /> 3.2 Respiratory/Eye/Ear Protection <br /> a. During the trenching or drilling activities, ambient air and soil vapor will be monitored <br /> with an OVA. - <br /> b. Site perimeter will also be monitored on 30 minute intervals. Monitoring frequency <br /> will be increased by the site manager if conditions approach 10 ppm with the OVA. <br /> c. Half face/full face respirators will be wom as warranted (see Section 5). <br /> d. Safety glasses/goggles will be wom during all activities. <br /> e. Appropriate hearing protection will be used as warranted (see Section 4.2). <br /> 4.0 - PHYSICAL HAZARDS <br /> Safety hazards will be typical of those associated with construction activities involving heavy <br /> equipment. Possible hazards include heat stress, noise, drilling, and excavation activities. <br /> 4.1 Excavation <br /> Contractor personnel will be responsible for performing the trenching and adhering to <br /> standard safety procedures. The exclusion zone for the work area will be a 30-foot <br /> radius around the trenching area. Only authorized.personnel will be permitted within <br /> the exclusion zone. No smoking will be permitted within the exclusion zone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.