My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:51:32 AM
Creation date
6/25/2019 8:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Drilling <br /> Spectrum personnel will be responsible for performing the drilling and adhering to <br /> standard safety procedures. The exclusion zone for the work area will be a 30-foot <br /> radius around the drill rig. Only authorized personnel will be permitted within the <br /> exclusion zone. No smoking will be permitted within the exclusion zone. <br /> 4.3 Noise <br /> Noise may be a hazard in the vicinity of the work area. Hearing protection will be <br /> wom when working near heavy equipment or loud mechanical equipment. <br /> 4.4 Heat Stress <br /> Heat stress will be a hazard during hot weather and will be intensified when workers <br /> are in protective clothing. Workers will be required to take breaks, as needed, to <br /> prevent heat stress and to consume adequate quantities of liquid. <br /> 5.0 - AMBIENT AIR MONITORLNG/RESPIRATORREOUIREMENTS <br /> a. Breathing zone vapor at detectable concentrations at the work area, as detected by an <br /> OVA, requires site personnel to use a respirator with organic vapor cartridges and <br /> goggles while working in the exclusion zone. The OSHA-PEL for benzene is 1.0 ppm <br /> (see Table 5-1 below). <br /> b. Breathing zone vapor at detectable concentrations requires site manager to monitor the <br /> site perimeter (concentrating in the down wind direction). <br /> C. Breathing zone vapor concentrations that reach or exceed 10 ppm at the work area, as <br /> detected by the OVA, requires site personnel to use a full face respirator with organic <br /> vapor cartridges while working in the exclusion zone. <br /> d. Breathing zone vanor concentrations that reach or exceed 50 Porn at the work area, as <br /> detected by the OVA, requires site activities to be stopped until concentrations <br /> decrease. Site manager should continuously monitor site perimeter. <br /> e. If breathing zone vapor concentrations are detected at the site perimeter, the site <br /> manager shall monitor the perimeter at 30 minute intervals. <br /> f. If the vapor concentrations continue to reach or exceed a value of 10 ppm at the site <br /> perimeter for 15 minutes, work activities shall be stopped. Appropriate regulatory <br /> agencies should be contacted (see contact sheet). Site manager shall continue to <br /> monitor conditions until levels are reduced to background conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.