Monitor Well Installation Work Plan <br /> Pilkington North America,Inc. <br /> July 16,2001 <br /> Page 4- <br /> conductivity and pH of the water has stabilized. At least three casing volumes of water will be purged <br /> from each well.Purged water will be discharged to the ground in the vicinity of the wells. <br /> The groundwater samples will be collected with clean, disposable bailers and transferred to laboratory <br /> supplied containers. The type of containers for each analyte is listed in Table 1, below. Each container <br /> will be labeled for sample identification and placed in a cooler chilled with Blue Ice. Upon completion of <br /> the fieldwork, the water samples will be delivered under chain-of-custody procedures to a state-certified <br /> laboratory for analyses. <br /> 4.7 LABORATORY ANALYSES <br /> Groundwater samples will be tested for the constituents and parameters listed in the Groundwater <br /> Monitoring and Reporting Program of the WDR Order No. 5-01-114 for the Pilkington North America, <br /> Inc. facility in San Joaquin County. They are relisted in Table 1,below. <br /> Table 1: Groundwater Monitoring Parameters <br /> Analyte Method Units Container Holding <br /> Time <br /> Nitrate as N 300.0 mg/L 1 Liter 48 hours <br /> TDS 160.1 mg/L Same liter 7 days <br /> PH 150.1 pH units Same liter ASAP <br /> Total Coliform Organisms 9221B MPN/100 ml 125 ml sterile 6 hours <br /> 8010 or VOA 14 days <br /> Trihalomethanesn/L preserved <br /> 502.2 with HCL <br /> Standard Minerals <br /> Alkalinity SM2320B mg/L 1 Liter for all 24 hours <br /> Std. Minerals <br /> Barium 200.7 mg/L <br /> Calcium 200.7 mg/L <br /> Chloride 300.0 mg/L <br /> Hardness 200.7 mg/L <br /> Magnesium 200.7 mg/L <br /> Nitrate 300.0 mg/L <br /> Sodium 200.7 mg/L <br /> Potassium 200.7 mg/L <br /> Sulfate 300.0 mg/L <br /> ' Analysis for trihalotnethanes will be conducted if chlorine was added to the wastewater <br /> storage pond during the last year. <br /> 5.0 REPORTING <br /> A Monitoring Well Installation Report of Results will be prepared for submittal to the Regional Board <br /> describing the results of the field work. At a minimum the report will include: (1) project background <br /> information, (2) a description of the fieldwork conducted at the site, (3)the laboratory results (including <br /> a tabular summary and the laboratory analytical reports), (4) a scaled site plan and groundwater contour <br /> map, (5) drilling logs, (6) conclusions, and(7) recommendations. The report will also include a geologic <br />