Laserfiche WebLink
Monitor Well Installation Work Plan <br /> Pilkington North America,Inc. <br /> July 16,2001 <br /> Page-5- <br /> log and an as-built construction diagram for each monitor well. Information provided will include the <br /> calculated and actual volumes of the filter pack and annular seal materials used in each well installation <br /> and the surveyed reference point elevation for each well, surveyors notes and other elements listed in <br /> Attachment C of the WDR. <br /> 6.0 SCHEDULE <br /> Fieldwork can be initiated within approximately 30 days after approval of this work plan by the Regional <br /> Board, subject to the availability of the drilling contractor. The field activities and laboratory testing <br /> described can be completed and a Monitoring Well Installation Report of Results prepared and submitted <br /> to the Regional Board within 120 days of their staff approval of this workplan. <br /> If you have any questions or require additional information,please call Jeff Willett at(209)234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> Lee H.Morse Jeff Willett,P.E. <br /> Staff Geologist Senior Project Manager <br /> ]?:1315 IA PLOFMonitor Well Installation Work Plan.doc <br />